Tsung-Sheng Cheng, Kuen-Min Lee, Yi-Hung Lu, M. Huang, Wan-Ting Hong
{"title":"Design and Implement for Reducing the Temporary High Load of Device in Industrial Networks","authors":"Tsung-Sheng Cheng, Kuen-Min Lee, Yi-Hung Lu, M. Huang, Wan-Ting Hong","doi":"10.1109/ICSSE.2018.8519966","DOIUrl":null,"url":null,"abstract":"With the concept of Industry 4.0 spreading, smart manufacturing is going to work in a brand new production process, in which a number of technologies are integrated, including cyber-physical systems, the Internet of Things, and the Internet of Services, to facilitate a new business model of “smart manufacturing and service”. The key to an intelligent automation system is the capability of software/hardware system integration regarding various equipments and controllers, where response time of the equipment plays an important role. However, in an industrial transmission network, the hardware specification of the receiver is probably not good enough, so that the processor in the receiver may be unable to process multiple requests simultaneously. This paper proposes a method for scheduling multiple periodic requests. This method can reduce the burden on the device when the device is high loading in order to maintain the effective operation of the device.","PeriodicalId":431387,"journal":{"name":"2018 International Conference on System Science and Engineering (ICSSE)","volume":"95 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Conference on System Science and Engineering (ICSSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSE.2018.8519966","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
With the concept of Industry 4.0 spreading, smart manufacturing is going to work in a brand new production process, in which a number of technologies are integrated, including cyber-physical systems, the Internet of Things, and the Internet of Services, to facilitate a new business model of “smart manufacturing and service”. The key to an intelligent automation system is the capability of software/hardware system integration regarding various equipments and controllers, where response time of the equipment plays an important role. However, in an industrial transmission network, the hardware specification of the receiver is probably not good enough, so that the processor in the receiver may be unable to process multiple requests simultaneously. This paper proposes a method for scheduling multiple periodic requests. This method can reduce the burden on the device when the device is high loading in order to maintain the effective operation of the device.