RISK MANAGEMENT IN THE JABODEBEK LRT (LIGHT RAIL TRANSIT) DEVEL-OPMENT PROJECT, IN JAKARTA AND ITS NEIGHBOURING CITIES

Trijeti Trijeti, Andi Madeppungeng, Rachmat Said Rasul, Rachmad Irwanto
{"title":"RISK MANAGEMENT IN THE JABODEBEK LRT (LIGHT RAIL TRANSIT) DEVEL-OPMENT PROJECT, IN JAKARTA AND ITS NEIGHBOURING CITIES","authors":"Trijeti Trijeti, Andi Madeppungeng, Rachmat Said Rasul, Rachmad Irwanto","doi":"10.24853/ijcei.2.1.70-87","DOIUrl":null,"url":null,"abstract":"LRT (Light Rail Transit) is one solution for an environmentally friendly transportation system to overcome congestion problems that occur in Jakarta. This mass transportation is considered effective because there is less land in the capital for road construction. The project is a complex project that includes design, material procurement and construction. The development that is currently underway is cross-service 1 (Cawang-Cibubur), cross-service 2 (Cawang-Dukuh Atas) and cross-service 3 (Cawang-Bekasi East). This study aims to determine the risks that often arise and find out the right way to handle the risks that arise in the construction of the JABODEBEK LRT project. Data was collected using a questionnaire on 45 respondents who were involved in the construction of the JABODEBEK LRT project. The variables studied in this study are aspects of scheduling planning, aspects of scope and work documents (contracts), aspects of organizational systems, coordination and communication, aspects of resource readiness/preparation, aspects of inspection systems, work control and evaluation and other aspects (force majeure /beyond the ability of the owner and contractor). Data processing in this study used the SPSS version 25 program. This study discusses seven variables classified as high risk (H) in the project.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Civil Engineering and Infrastructure","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24853/ijcei.2.1.70-87","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

LRT (Light Rail Transit) is one solution for an environmentally friendly transportation system to overcome congestion problems that occur in Jakarta. This mass transportation is considered effective because there is less land in the capital for road construction. The project is a complex project that includes design, material procurement and construction. The development that is currently underway is cross-service 1 (Cawang-Cibubur), cross-service 2 (Cawang-Dukuh Atas) and cross-service 3 (Cawang-Bekasi East). This study aims to determine the risks that often arise and find out the right way to handle the risks that arise in the construction of the JABODEBEK LRT project. Data was collected using a questionnaire on 45 respondents who were involved in the construction of the JABODEBEK LRT project. The variables studied in this study are aspects of scheduling planning, aspects of scope and work documents (contracts), aspects of organizational systems, coordination and communication, aspects of resource readiness/preparation, aspects of inspection systems, work control and evaluation and other aspects (force majeure /beyond the ability of the owner and contractor). Data processing in this study used the SPSS version 25 program. This study discusses seven variables classified as high risk (H) in the project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
雅加达及其邻近城市jabodebek轻轨(LRT)开发项目的风险管理
轻轨交通(LRT)是一种环保型交通系统的解决方案,可以克服雅加达出现的拥堵问题。这种大规模运输被认为是有效的,因为首都用于道路建设的土地较少。该工程是一个复杂的工程,包括设计、材料采购和施工。目前正在进行的开发是跨服务1 (Cawang-Cibubur),跨服务2 (Cawang-Dukuh Atas)和跨服务3 (Cawang-Bekasi East)。本研究旨在确定JABODEBEK轻轨项目建设中经常出现的风险,并找出正确的方法来处理风险。数据是通过对参与JABODEBEK轻轨项目建设的45名受访者进行问卷调查收集的。本研究中研究的变量是调度计划方面、范围和工作文件(合同)方面、组织系统、协调和沟通方面、资源准备/准备方面、检查系统方面、工作控制和评估方面以及其他方面(不可抗力/超出业主和承包商的能力)。本研究的数据处理使用SPSS第25版程序。本研究讨论了项目中被分类为高风险(H)的七个变量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
NUMERICAL MODELLING ON BEHAVIOUR OF COLD-FORMED STEEL UNLIPPED CHANNEL UNDER COMBINED COMPRESSION AND BENDING ACTIONS SIMULATION OF RING CONNECTION MODIFICATION ON FLARE STACK STRUCTURE STUDY ON FREE VIBRATION OF SKEW PLATE USING FINITE ELEMENT METHOD THE TRAVEL TIME PERFOMANCE ANALYSIS OF THE COMMUTER LINE TRAIN (KRL) (CASE STUDY: THE COMMUTER LINE TRAIN BLUE LINE CORRIDOR, BEKASI - JAKARTA KOTA) VALUE STREAM MAPPING FOR WASTE IDENTIFICATION IN THE LOW COST HOUSE CONSTRUCTION PROCESS (CASE STUDY: XYZ HOUSING
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1