DESAIN CHANGES IN A SHORT DURATION CONSTRUCTION PROJECT WITH COST AND TIME BOUNDARIES: A PROJECT REVIEW 在具有成本和时间限制的短期建设项目中设计变更:项目回顾
Pub Date : 2023-01-04 DOI: 10.24853/ijcei.2.2.19-27
Rachmad Irwanto
Design changes are inevitable in most projects. In many construction projects they may look not too complicated to be executed in front of computer models. The actual situation turned out to be the other way around. Apart from detailed changes in shop drawings, bill of quantity and specifications, administrative works related to the project are quite considerations. These mounted consequences would be more for short duration projects with government funding executed in the near end book period. The allocated execution period for short duration projects is not usually allowing rapid changes for the unexpected consequences. This paper presents what actually happens inside the project management during the contract change order process.
在大多数项目中,设计变更是不可避免的。在许多建筑项目中,它们可能看起来不太复杂,无法在计算机模型面前执行。实际情况却正好相反。除了施工图、工程量清单和规格的详细更改外,与项目相关的行政工作也非常需要考虑。这些增加的后果将更多地出现在短期项目中,这些项目由政府资助,在接近账面期末执行。为短期项目分配的执行周期通常不允许对意外结果进行快速更改。本文介绍了在合同变更订单过程中项目管理内部实际发生的情况。
{"title":"DESAIN CHANGES IN A SHORT DURATION CONSTRUCTION PROJECT WITH COST AND TIME BOUNDARIES: A PROJECT REVIEW","authors":"Rachmad Irwanto","doi":"10.24853/ijcei.2.2.19-27","DOIUrl":"https://doi.org/10.24853/ijcei.2.2.19-27","url":null,"abstract":"Design changes are inevitable in most projects. In many construction projects they may look not too complicated to be executed in front of computer models. The actual situation turned out to be the other way around. Apart from detailed changes in shop drawings, bill of quantity and specifications, administrative works related to the project are quite considerations. These mounted consequences would be more for short duration projects with government funding executed in the near end book period. The allocated execution period for short duration projects is not usually allowing rapid changes for the unexpected consequences. This paper presents what actually happens inside the project management during the contract change order process.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"25 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129071879","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
THE TRAVEL TIME PERFOMANCE ANALYSIS OF THE COMMUTER LINE TRAIN (KRL) (CASE STUDY: THE COMMUTER LINE TRAIN BLUE LINE CORRIDOR, BEKASI - JAKARTA KOTA) 通勤线列车(krl)的旅行时间性能分析(以通勤线列车蓝线走廊,勿加西-雅加达哥打为例)
Pub Date : 2023-01-04 DOI: 10.24853/ijcei.2.2.48-56
Bayu Aji Pangestu, Irnanda Satya Soerjatmodjo, Noviandi Putra Darsono
On the commuter line trains (the KRL), the Bekasi-Jakarta City Blue Line corridor has a buildup of passengers so that it can reduce travel time. Based on the regulation of the Minister of Transportation No. 63 of 2019 on Minimum Service Standards for Transportation of People by Train, the maximum delay tolerance for urban trains is 15 minutes from the total scheduled travel time. The method used is the depiction of working charts and calculations of statistical analysis with standard deviation in SPSS application version 26. The difference in the comparison of scheduled travel times with those in the field is determined by using Microsoft Excel for Windows version 2015. The performance of Blue Line routes (the KRL) was reviewed based on travel time using the SPSS (Statistical Package for the Social Sciences) analysis tool version 26. The standard deviation results using the SPSS KA 1341 analysis tool have a higher deviation standard result of 10.82, which means that the train has a higher travel time delay than the train of PT Kereta Commuter Indonesia (KCI), which experienced an average delay of 4 minutes. The cause of the delay consists of several factors, including the queue of passengers who want to get into the train and the fact that traffic on the blue line KRL route is congested. Because it has to alternate with intercity trains, and the KRL must wait.
在通勤列车(KRL)上,勿加西-雅加达城市蓝线走廊上有大量乘客,因此可以减少旅行时间。根据交通运输部2019年第63号《列车人员运输最低服务标准》的规定,城市列车的最大延误容忍时间是预定旅行时间的15分钟。使用的方法是在SPSS应用程序版本26中绘制工作图和计算标准差统计分析。计划出行时间与实地出行时间比较的差异是通过Microsoft Excel for Windows version 2015确定的。使用SPSS (Statistical Package for The Social Sciences)分析工具第26版,对蓝线路线(KRL)的表现进行了基于旅行时间的评估。使用SPSS KA 1341分析工具得到的标准差结果有较高的偏差标准结果为10.82,这意味着该列车比印尼PT Kereta Commuter (KCI)列车有更高的旅行时间延误,后者的平均延误时间为4分钟。造成列车延误的原因有很多,其中包括排队等候上车的乘客,以及首尔地铁蓝线的交通拥堵等。因为它必须与城际列车交替,而KRL必须等待。
{"title":"THE TRAVEL TIME PERFOMANCE ANALYSIS OF THE COMMUTER LINE TRAIN (KRL) (CASE STUDY: THE COMMUTER LINE TRAIN BLUE LINE CORRIDOR, BEKASI - JAKARTA KOTA)","authors":"Bayu Aji Pangestu, Irnanda Satya Soerjatmodjo, Noviandi Putra Darsono","doi":"10.24853/ijcei.2.2.48-56","DOIUrl":"https://doi.org/10.24853/ijcei.2.2.48-56","url":null,"abstract":"On the commuter line trains (the KRL), the Bekasi-Jakarta City Blue Line corridor has a buildup of passengers so that it can reduce travel time. Based on the regulation of the Minister of Transportation No. 63 of 2019 on Minimum Service Standards for Transportation of People by Train, the maximum delay tolerance for urban trains is 15 minutes from the total scheduled travel time. The method used is the depiction of working charts and calculations of statistical analysis with standard deviation in SPSS application version 26. The difference in the comparison of scheduled travel times with those in the field is determined by using Microsoft Excel for Windows version 2015. The performance of Blue Line routes (the KRL) was reviewed based on travel time using the SPSS (Statistical Package for the Social Sciences) analysis tool version 26. The standard deviation results using the SPSS KA 1341 analysis tool have a higher deviation standard result of 10.82, which means that the train has a higher travel time delay than the train of PT Kereta Commuter Indonesia (KCI), which experienced an average delay of 4 minutes. The cause of the delay consists of several factors, including the queue of passengers who want to get into the train and the fact that traffic on the blue line KRL route is congested. Because it has to alternate with intercity trains, and the KRL must wait.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121070771","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
NORMALIZATION ANALYSIS OF BUARAN RIVER USING THE HEC-RAS APPLICATION (THE BUKIT KENCANA RESIDENTIAL AREA TO JAKARTA CIKAMPEK TOLL) 利用hec-ras应用程序对buaran河进行归一化分析(bukit kencana居民区至雅加达cikampek收费)
Pub Date : 2023-01-04 DOI: 10.24853/ijcei.2.2.66-75
M. Imamuddin
The channel in the Buaran River area has a channel length of 5.32 km located in the Bukit Kencana Housing Area as the upstream of the Buaran River with the smallest cross-sectional width of 0.9 m and a height of 1 m and the border of the Jakarta Cikampek Toll Road as a downstream with a width of 2.2 m and a height of 3.6 m. one of the areas of the Buaran River which experienced quite severe flooding. This was due to changes or conversion of land functions which were originally water catchment areas to settlements. The large number of buildings that stand on the body of the river makes the current section of the Buaran River unable to function optimally in accommodating flood discharges, besides that there is no public awareness in protecting the environment which can be seen from the many piles of garbage in the body of the river. The purpose of this research is to find out how big the capacity of the existing Buaran cross-section is (starting from the Bukit Kencana Residential Area to the Jakarta Cikampek Toll Road) by modeling the existing cross-section using the help of the Hec-Rass application as well as recording and mapping locations that have the potential to flood. . One of the efforts that have been made by the government in controlling floods is by normalizing the river but in practice, the normalization of the Buaran River cannot be said to be running optimally. Based on hydrological calculations, the planned Q25 flood discharge is 16,307 m3/s. By using the help of the Hec-Ras application we can find out which river profiles need to be treated so that the handling of river normalization as an alternative to flood control can run optimally
Buaran河地区的通道的通道长度5.32公里位于Bukit Kencana住房面积Buaran河的上游的最小横截面宽度0.9米和1米的高度,雅加达Cikampek收费公路的边界作为下游宽度为2.2米,高度为3.6 m . Buaran河的地区之一,经历了相当严重的水灾。这是由于土地功能的变化或转换,原来是集水区到定居点。大量的建筑矗立在河体上,使得目前的布然河无法发挥最优的泄洪功能,此外,从河体中成堆的垃圾可以看出,公众没有保护环境的意识。本研究的目的是找出现有的Buaran横截面的容量有多大(从Bukit Kencana住宅区开始到雅加达Cikampek收费公路),通过使用Hec-Rass应用程序对现有横截面进行建模,并记录和绘制有可能发生洪水的位置。政府在控制洪水方面所做的努力之一是使布兰江正常化,但实际上,布兰江的正常化并不能说是最理想的。经水文计算,Q25规划洪流量为16307 m3/s。通过使用Hec-Ras应用程序的帮助,我们可以找出需要处理的河流剖面,以便将河流归一化处理作为洪水控制的替代方案可以最佳地运行
{"title":"NORMALIZATION ANALYSIS OF BUARAN RIVER USING THE HEC-RAS APPLICATION (THE BUKIT KENCANA RESIDENTIAL AREA TO JAKARTA CIKAMPEK TOLL)","authors":"M. Imamuddin","doi":"10.24853/ijcei.2.2.66-75","DOIUrl":"https://doi.org/10.24853/ijcei.2.2.66-75","url":null,"abstract":"The channel in the Buaran River area has a channel length of 5.32 km located in the Bukit Kencana Housing Area as the upstream of the Buaran River with the smallest cross-sectional width of 0.9 m and a height of 1 m and the border of the Jakarta Cikampek Toll Road as a downstream with a width of 2.2 m and a height of 3.6 m. one of the areas of the Buaran River which experienced quite severe flooding. This was due to changes or conversion of land functions which were originally water catchment areas to settlements. The large number of buildings that stand on the body of the river makes the current section of the Buaran River unable to function optimally in accommodating flood discharges, besides that there is no public awareness in protecting the environment which can be seen from the many piles of garbage in the body of the river. The purpose of this research is to find out how big the capacity of the existing Buaran cross-section is (starting from the Bukit Kencana Residential Area to the Jakarta Cikampek Toll Road) by modeling the existing cross-section using the help of the Hec-Rass application as well as recording and mapping locations that have the potential to flood. . One of the efforts that have been made by the government in controlling floods is by normalizing the river but in practice, the normalization of the Buaran River cannot be said to be running optimally. Based on hydrological calculations, the planned Q25 flood discharge is 16,307 m3/s. By using the help of the Hec-Ras application we can find out which river profiles need to be treated so that the handling of river normalization as an alternative to flood control can run optimally","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128484162","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
SIMULATION OF RING CONNECTION MODIFICATION ON FLARE STACK STRUCTURE 火炬堆结构环接修改的仿真
Pub Date : 2023-01-04 DOI: 10.24853/ijcei.2.2.1-9
Budi Satiawan, Basit Al Hanif, Tanjung Rahayu Raswitaningrum
The flare stack serves to protect process equipment facilities against unexpected overpressure. This study aims to follow up on previous research that recommends improvements to the flare stack structure based on corrosion findings that occur in the area of the riser stack around the ring connection for the guy wire. By replacing rusty material, it is also necessary to consider modifications to prevent the risk of re-corrosion. Based on current design observations in the connection ring area for guy wire, side cutting is required which can result in water being trapped. This research aims to find out whether by modifying the connection ring for guy wire, this flare structure still has structural reliability when receiving critical outer loads or not. Based on the results of the study, it shows that modifying the geometry of the connection ring guy wire still provides reliable structural performance when receiving critical outer loads. The maximum stress that occurs in the area around the pad eye is 71.2 Mpa with a maximum stress ratio of 0.434 it shows that the value is still quite far from the maximum allowable voltage ratio of 1.0. So it can be concluded by modifying the connection ring for guy wire to prevent the risk of corrosion can be done without causing a decrease in the performance of the structure in withstanding critical outer loads.
火炬堆用于保护工艺设备设施免受意外超压。该研究旨在跟进先前的研究,该研究建议改进火炬堆结构,该研究基于在立管堆环连接周围区域发生的腐蚀发现。通过更换生锈的材料,也有必要考虑修改,以防止再次腐蚀的风险。根据目前的设计观察,在拉索的连接环区域,需要侧切,这可能导致水被困。本研究的目的是通过对顶丝连接环的修改,在承受临界外载荷时,该火炬结构是否仍具有结构可靠性。研究结果表明,在承受临界外载荷时,改变连接环拉索的几何形状仍能提供可靠的结构性能。垫眼周围区域的最大应力为71.2 Mpa,最大应力比为0.434,说明该值与最大允许电压比1.0还有很大距离。因此,在不影响结构承受临界外载荷性能的情况下,通过修改搭接环来防止腐蚀风险是可以做到的。
{"title":"SIMULATION OF RING CONNECTION MODIFICATION ON FLARE STACK STRUCTURE","authors":"Budi Satiawan, Basit Al Hanif, Tanjung Rahayu Raswitaningrum","doi":"10.24853/ijcei.2.2.1-9","DOIUrl":"https://doi.org/10.24853/ijcei.2.2.1-9","url":null,"abstract":"The flare stack serves to protect process equipment facilities against unexpected overpressure. This study aims to follow up on previous research that recommends improvements to the flare stack structure based on corrosion findings that occur in the area of the riser stack around the ring connection for the guy wire. By replacing rusty material, it is also necessary to consider modifications to prevent the risk of re-corrosion. Based on current design observations in the connection ring area for guy wire, side cutting is required which can result in water being trapped. This research aims to find out whether by modifying the connection ring for guy wire, this flare structure still has structural reliability when receiving critical outer loads or not. Based on the results of the study, it shows that modifying the geometry of the connection ring guy wire still provides reliable structural performance when receiving critical outer loads. The maximum stress that occurs in the area around the pad eye is 71.2 Mpa with a maximum stress ratio of 0.434 it shows that the value is still quite far from the maximum allowable voltage ratio of 1.0. So it can be concluded by modifying the connection ring for guy wire to prevent the risk of corrosion can be done without causing a decrease in the performance of the structure in withstanding critical outer loads.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"422 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115919986","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
STUDY ON FREE VIBRATION OF SKEW PLATE USING FINITE ELEMENT METHOD 用有限元法研究斜板的自由振动
Pub Date : 2023-01-04 DOI: 10.24853/ijcei.2.2.28-36
B. Budiman
A numerical procedure is presented for free vibration analysis of skew plates using the finite element method. The finite element method is a tool used by many researchers to analyze plates element and gives good results. In this research, the natural frequency of the plate is obtained through free vibration analysis, the analysis utilizes skew plate elements with several skew angles and varying length to thickness ratios. The reference solution in the literature will be used as a comparison to obtain the convergence behavior of the plate element. 
提出了用有限元法分析斜板自由振动的数值方法。有限元法是许多研究人员用来分析板单元的一种工具,并取得了很好的结果。在本研究中,通过自由振动分析得到板的固有频率,分析利用具有多个斜角和不同长厚比的斜板单元。文献中的参考解将被用作比较,以获得板单元的收敛行为。
{"title":"STUDY ON FREE VIBRATION OF SKEW PLATE USING FINITE ELEMENT METHOD","authors":"B. Budiman","doi":"10.24853/ijcei.2.2.28-36","DOIUrl":"https://doi.org/10.24853/ijcei.2.2.28-36","url":null,"abstract":"A numerical procedure is presented for free vibration analysis of skew plates using the finite element method. The finite element method is a tool used by many researchers to analyze plates element and gives good results. In this research, the natural frequency of the plate is obtained through free vibration analysis, the analysis utilizes skew plate elements with several skew angles and varying length to thickness ratios. The reference solution in the literature will be used as a comparison to obtain the convergence behavior of the plate element. ","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116402762","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
NUMERICAL STUDY ON BEHAVIOUR OF COLD-FORMED STEEL UNLIPPED CHANNEL SUBJECT TO AXIAL COMPRESSION 轴压作用下冷弯型钢无唇槽钢性能的数值研究
Pub Date : 2023-01-04 DOI: 10.24853/ijcei.2.2.57-65
Hidayat Mughnie, B. Budiman, Rachmad Irwanto, Muhammad Taufiq Al Hafidz
Innovation in obtaining construction materials that are efficient and applicable to various conditions is a challenge for researchers. Cold-formed steel is a material breakthrough in construction that has advantages over hot-rolled steel. Many studies have been carried out on Cold-formedsteel subjected to various loadings to examine the behavior and capacities of the sections. This study aims to investigate the behavior and section capacity of cold-formed steel unlipped channels due to axial compression loads. This research begins with conducting a literature study, then carrying out numerical analysis using the finite element method in ABAQUS, numerical test, and calculation of section capacity based on existing research in the literature. The calculation of section capacity is carried out based on SNI 7971-2013 or AS/NZS 4600:2005. The results of the numerical analysis can be seen from the behavior and capacities of the sections of the unlipped channel, the section capacity from the numerical test will be compared with the section capacity obtained from the calculation based on SNI 7971-2013 or AS/NZS 4600.
如何获得高效且适用于各种条件的建筑材料是研究人员面临的一个挑战。冷弯型钢是建筑材料上的突破,它比热轧型钢更有优势。为了检验截面的性能和能力,对冷弯型钢在各种载荷下进行了许多研究。本研究旨在探讨冷弯型钢无唇槽体在轴压荷载作用下的性能及截面承载力。本研究首先进行文献研究,然后在已有文献研究的基础上,利用ABAQUS有限元法进行数值分析,并进行数值试验,计算截面承载力。截面容量的计算基于SNI 7971-2013或AS/NZS 4600:2005。数值分析的结果可以从非唇形通道断面的行为和容量中看出,数值试验的断面容量将与基于SNI 7971-2013或AS/NZS 4600计算得到的断面容量进行比较。
{"title":"NUMERICAL STUDY ON BEHAVIOUR OF COLD-FORMED STEEL UNLIPPED CHANNEL SUBJECT TO AXIAL COMPRESSION","authors":"Hidayat Mughnie, B. Budiman, Rachmad Irwanto, Muhammad Taufiq Al Hafidz","doi":"10.24853/ijcei.2.2.57-65","DOIUrl":"https://doi.org/10.24853/ijcei.2.2.57-65","url":null,"abstract":"Innovation in obtaining construction materials that are efficient and applicable to various conditions is a challenge for researchers. Cold-formed steel is a material breakthrough in construction that has advantages over hot-rolled steel. Many studies have been carried out on Cold-formedsteel subjected to various loadings to examine the behavior and capacities of the sections. This study aims to investigate the behavior and section capacity of cold-formed steel unlipped channels due to axial compression loads. This research begins with conducting a literature study, then carrying out numerical analysis using the finite element method in ABAQUS, numerical test, and calculation of section capacity based on existing research in the literature. The calculation of section capacity is carried out based on SNI 7971-2013 or AS/NZS 4600:2005. The results of the numerical analysis can be seen from the behavior and capacities of the sections of the unlipped channel, the section capacity from the numerical test will be compared with the section capacity obtained from the calculation based on SNI 7971-2013 or AS/NZS 4600.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132069165","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
VALUE STREAM MAPPING FOR WASTE IDENTIFICATION IN THE LOW COST HOUSE CONSTRUCTION PROCESS (CASE STUDY: XYZ HOUSING 低成本房屋建造过程中废物识别的价值流映射(案例研究:xyz房屋)
Pub Date : 2023-01-04 DOI: 10.24853/ijcei.2.2.37-47
Nurlaelah Nurlaelah
XYZ housing is a low cost  housing created by developers with low-income individuals in mind. However, a lot of individuals bemoan the state of their houses because of flaws like leaks, peeling paint, and other issues. This is unquestionably connected to the way the contractor handled the construction process. When there are signs of waste, particularly when there are delays and waste inventories, it is possible that there will also be additional sorts of waste throughout implementation. By employing the value stream mapping method, this study seeks to both detect and simultaneously minimize or eliminate waste that happens during the construction of affordable homes. Two key tasks are completed: creating an overview of the current state map, which represents the state of the development process currently, and offering solutions and suggestions for improvement given as a future state map.
XYZ住房是开发商为低收入人群设计的低成本住房。然而,很多人抱怨他们的房子因为漏水、油漆剥落和其他问题的缺陷。毫无疑问,这与承包商处理施工过程的方式有关。当有浪费的迹象时,特别是当有延误和废物清单时,在整个实施过程中可能还会有其他种类的浪费。通过采用价值流映射方法,本研究试图检测并同时减少或消除在经济适用房建设过程中发生的浪费。完成了两个关键任务:创建当前状态图的概述,它表示当前开发过程的状态,并提供解决方案和改进建议,作为未来的状态图。
{"title":"VALUE STREAM MAPPING FOR WASTE IDENTIFICATION IN THE LOW COST HOUSE CONSTRUCTION PROCESS (CASE STUDY: XYZ HOUSING","authors":"Nurlaelah Nurlaelah","doi":"10.24853/ijcei.2.2.37-47","DOIUrl":"https://doi.org/10.24853/ijcei.2.2.37-47","url":null,"abstract":"XYZ housing is a low cost  housing created by developers with low-income individuals in mind. However, a lot of individuals bemoan the state of their houses because of flaws like leaks, peeling paint, and other issues. This is unquestionably connected to the way the contractor handled the construction process. When there are signs of waste, particularly when there are delays and waste inventories, it is possible that there will also be additional sorts of waste throughout implementation. By employing the value stream mapping method, this study seeks to both detect and simultaneously minimize or eliminate waste that happens during the construction of affordable homes. Two key tasks are completed: creating an overview of the current state map, which represents the state of the development process currently, and offering solutions and suggestions for improvement given as a future state map.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125828501","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
NUMERICAL MODELLING ON BEHAVIOUR OF COLD-FORMED STEEL UNLIPPED CHANNEL UNDER COMBINED COMPRESSION AND BENDING ACTIONS 冷弯型钢非唇形通道在压缩和弯曲联合作用下的数值模拟
Pub Date : 2023-01-04 DOI: 10.24853/ijcei.2.2.10-18
Tanjung Rahayu Raswitaningrum, B. Budiman, Basit Al Hanif, Sahrul Mujib
Research and development of construction materials continue to be carried out, getting materials, cross-sectional shapes, and manufacturing methods that are more efficient than before. Cold-formed steel is a material breakthrough in construction that has advantages over hot-rolled steel. In this paper, the cross-section of cold-rolled steel unlipped channel will be analyzed which is subjected to a combination of axial and bending loads. Investigating elements will be carried out using the finite element method on ABAQUS, and the results of the analysis produce a visualization of the behavior and capacity of the cold-rolled steel section. The cross-section capacity results obtained from the numerical test results will be compared with the predictions given by SNI 7971-2013 or AS/NZS 4600. Existing research in the literature will be used as a reference in conducting numerical analysis and calculating ultimate capacities.
建筑材料的研究和开发继续进行,获得比以前更有效的材料,截面形状和制造方法。冷弯型钢是建筑材料上的突破,它比热轧型钢更有优势。本文对冷轧钢板无唇槽钢在轴向和弯曲载荷共同作用下的截面进行了分析。利用ABAQUS上的有限元方法对构件进行调查,分析结果产生冷轧型钢截面的行为和能力的可视化。从数值试验结果中获得的截面容量结果将与SNI 7971-2013或AS/NZS 4600给出的预测结果进行比较。现有的文献研究将作为进行数值分析和计算极限能力的参考。
{"title":"NUMERICAL MODELLING ON BEHAVIOUR OF COLD-FORMED STEEL UNLIPPED CHANNEL UNDER COMBINED COMPRESSION AND BENDING ACTIONS","authors":"Tanjung Rahayu Raswitaningrum, B. Budiman, Basit Al Hanif, Sahrul Mujib","doi":"10.24853/ijcei.2.2.10-18","DOIUrl":"https://doi.org/10.24853/ijcei.2.2.10-18","url":null,"abstract":"Research and development of construction materials continue to be carried out, getting materials, cross-sectional shapes, and manufacturing methods that are more efficient than before. Cold-formed steel is a material breakthrough in construction that has advantages over hot-rolled steel. In this paper, the cross-section of cold-rolled steel unlipped channel will be analyzed which is subjected to a combination of axial and bending loads. Investigating elements will be carried out using the finite element method on ABAQUS, and the results of the analysis produce a visualization of the behavior and capacity of the cold-rolled steel section. The cross-section capacity results obtained from the numerical test results will be compared with the predictions given by SNI 7971-2013 or AS/NZS 4600. Existing research in the literature will be used as a reference in conducting numerical analysis and calculating ultimate capacities.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"56 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115792269","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
WHAT ACTUALLY DRIVE CONSTRUCTION PROJECT PERFORMANCE FROM OPERATIONS MANAGEMENT PERSPECTIVE 从运营管理的角度来看,到底是什么推动了建设项目的绩效
Pub Date : 2022-08-18 DOI: 10.24853/ijcei.2.1.32-40
Rachmad Irwanto
Construction industry is always an interesting discussion topic. Some have it approached from its planning and scheduling view accommodating risk analysis. Other interesting topics related to construction industry are its business model, organization and operations. The author argues that construction is a function of them all. An emphasized study on a specific topic above would be less relevant given the fact that construction industry is highly fragmented. From literature review, factors such project integration, communications, knowledge and understanding, human resources, safety, financial, and cost management drive more significant impact on project scheduling performance
建筑业一直是一个有趣的讨论话题。有的从适应风险分析的计划和调度角度来探讨。其他与建筑行业相关的有趣话题是其商业模式、组织和运营。作者认为,建筑是它们的一个功能。鉴于建筑业高度分散的事实,对上述特定主题的强调研究将不太相关。从文献综述来看,项目整合、沟通、知识和理解、人力资源、安全、财务和成本管理等因素对项目进度绩效的影响更为显著
{"title":"WHAT ACTUALLY DRIVE CONSTRUCTION PROJECT PERFORMANCE FROM OPERATIONS MANAGEMENT PERSPECTIVE","authors":"Rachmad Irwanto","doi":"10.24853/ijcei.2.1.32-40","DOIUrl":"https://doi.org/10.24853/ijcei.2.1.32-40","url":null,"abstract":"Construction industry is always an interesting discussion topic. Some have it approached from its planning and scheduling view accommodating risk analysis. Other interesting topics related to construction industry are its business model, organization and operations. The author argues that construction is a function of them all. An emphasized study on a specific topic above would be less relevant given the fact that construction industry is highly fragmented. From literature review, factors such project integration, communications, knowledge and understanding, human resources, safety, financial, and cost management drive more significant impact on project scheduling performance","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"27 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114522428","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
BUCKLING ANALYSIS OF SKEW PLATES SUBJECTED TO UNIFORM COMPRESSION LOADING 均布压缩载荷作用下斜板屈曲分析
Pub Date : 2022-08-18 DOI: 10.24853/ijcei.2.1.1-9
B. Budiman
The main objective of the research work is to present the buckling analysis of plates subjected to uniform compressive load. To obtain accurate results in analysis plate must be free from shear locking, this phenomenon occurs when the ratio of length to thickness ratios plate increases. Many investigations have been carried out on plate elements to see the behavior of a plate in the case of thin plates. In this paper, we investigated plate analysis in the case of buckling analysis using one of the finite element plates, the numerical analysis was conducted on a skew plate with varying length to thickness ratios, and skew angles.  The reference solution in the literature will be used to compare the analysis results the level of convergence and plate performance will be obtained.
研究工作的主要目的是对受均布压缩载荷作用的板进行屈曲分析。为了在分析中获得准确的结果,板材必须不受剪切锁紧,这种现象发生在板材长厚比增大时。在薄板的情况下,为了观察板的行为,人们对板元件进行了许多研究。本文研究了在屈曲分析的情况下,利用某一块有限元板进行板分析,并对具有不同长厚比、不同倾斜角度的斜板进行了数值分析。将文献中的参考解用于比较分析结果,得出收敛水平和平板性能。
{"title":"BUCKLING ANALYSIS OF SKEW PLATES SUBJECTED TO UNIFORM COMPRESSION LOADING","authors":"B. Budiman","doi":"10.24853/ijcei.2.1.1-9","DOIUrl":"https://doi.org/10.24853/ijcei.2.1.1-9","url":null,"abstract":"The main objective of the research work is to present the buckling analysis of plates subjected to uniform compressive load. To obtain accurate results in analysis plate must be free from shear locking, this phenomenon occurs when the ratio of length to thickness ratios plate increases. Many investigations have been carried out on plate elements to see the behavior of a plate in the case of thin plates. In this paper, we investigated plate analysis in the case of buckling analysis using one of the finite element plates, the numerical analysis was conducted on a skew plate with varying length to thickness ratios, and skew angles.  The reference solution in the literature will be used to compare the analysis results the level of convergence and plate performance will be obtained.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"34 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132351923","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
International Journal of Civil Engineering and Infrastructure
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1