Active power limitation of wind farm to reduce system operating cost

Jungchul Choi, Seon-Ju Ahn, Jin-Woo Park, S. Moon
{"title":"Active power limitation of wind farm to reduce system operating cost","authors":"Jungchul Choi, Seon-Ju Ahn, Jin-Woo Park, S. Moon","doi":"10.1109/TD-ASIA.2009.5356877","DOIUrl":null,"url":null,"abstract":"As wind power penetrations increase in isolated power systems, the power from wind energy will start to replace conventional generation units and its influence on power systems cannot be neglected. On the other hand, wind farm with the centralized power control scheme can behave as an active controllable component in the power system according to power references from system operator. Nevertheless, there are normally large uncertainties in the prediction of wind power output because of the intermittent nature of wind. Therefore, additional up/down reserve on a system is needed to cater for any possible unexpected generation deficit. This leads the increase of operating cost of power system. This paper presents an algorithm for active power output limitation of wind farm considering system operating cost in the isolated power systems. The unit commitment formulation for the system with wind farms is presented. Then, the procedure to adjust the generation schedule using decommittment method is proposed. In order to validate the effectiveness of the proposed algorithm, some numerical experiments with 10 unit system are conducted.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356877","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

As wind power penetrations increase in isolated power systems, the power from wind energy will start to replace conventional generation units and its influence on power systems cannot be neglected. On the other hand, wind farm with the centralized power control scheme can behave as an active controllable component in the power system according to power references from system operator. Nevertheless, there are normally large uncertainties in the prediction of wind power output because of the intermittent nature of wind. Therefore, additional up/down reserve on a system is needed to cater for any possible unexpected generation deficit. This leads the increase of operating cost of power system. This paper presents an algorithm for active power output limitation of wind farm considering system operating cost in the isolated power systems. The unit commitment formulation for the system with wind farms is presented. Then, the procedure to adjust the generation schedule using decommittment method is proposed. In order to validate the effectiveness of the proposed algorithm, some numerical experiments with 10 unit system are conducted.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
风电场有功功率限制,降低系统运行成本
随着风电在孤立电力系统中的渗透增加,风电将开始取代传统发电机组,对电力系统的影响不容忽视。另一方面,采用集中控制方案的风电场可以根据系统运营商的功率参考作为电力系统中的主动可控组件。然而,由于风的间歇性,通常在预测风电输出时有很大的不确定性。因此,系统需要额外的上行/下行储备,以满足任何可能出现的意外发电赤字。这导致了电力系统运行成本的增加。提出了一种考虑孤立电力系统运行成本的风电场有功输出限制算法。给出了带风电场系统的机组承诺公式。在此基础上,提出了利用退役法调整发电计划的方法。为了验证该算法的有效性,在10单位制下进行了数值实验。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Operational analysis of DC micro-grid using detailed model of distributed generation Real time digital simulator based test system for microgrid management system Case study of customer baseline(CBL) load determination in Korea based on statistical method Assessment of Conditional Value at Risk (CVaR) in transmission investment using Cross Entropy method Governor-response power flow (GRPF) based long-term voltage stability simulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1