Reliability Centered Maintenance on Critical Component in Indonesian Commercial Trains

S. Indrawati, Sunaryo, Agung Budi Raharjo, Riadho Clara Shinta, Alfina Budi Khoirani
{"title":"Reliability Centered Maintenance on Critical Component in Indonesian Commercial Trains","authors":"S. Indrawati, Sunaryo, Agung Budi Raharjo, Riadho Clara Shinta, Alfina Budi Khoirani","doi":"10.1109/ICSTC.2018.8528632","DOIUrl":null,"url":null,"abstract":"Bogie is a train component that performed to support the basic framework of train vehicle body. The Bogie maintenance in Indonesian commercial trains is done every 350.000 km-400.000 km. But many types of Bogie K5 is fail to operate before reaching a distance of 350.000 km. The Bogie K5 component can not being replaced by other Bogie type components because the specifications are different. This research is done to determine the critical components and its maintenance plan. The method used is reliability centered maintenance (RCM). The result shows that there are 21 components of Bogie K5 that categorized in safety problem, outage problem, economic problem and hidden failure. Brake block component becomes a critical component because it is included in the safety problem component and has the highest RPN (Risk Priority Number) value compared to other components. The RCM action is develop based on conditional directed (CD) and time directed (TD) category. Based on data distribution test for component of brake block, component time to failure is categorized as weibul distribution and component time to repair is categorized as lognormal distribution. The goodness of fit test shows that hypothesis testing is acceptable. For mean time to failures, the average time is 59,44 days, which means that the average component will be damaged after 59,44 days of operation. As for the mean time to repair value is 9,18 days which means that the average time to fix the critical component is 9,18 days.","PeriodicalId":196768,"journal":{"name":"2018 4th International Conference on Science and Technology (ICST)","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 4th International Conference on Science and Technology (ICST)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSTC.2018.8528632","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Bogie is a train component that performed to support the basic framework of train vehicle body. The Bogie maintenance in Indonesian commercial trains is done every 350.000 km-400.000 km. But many types of Bogie K5 is fail to operate before reaching a distance of 350.000 km. The Bogie K5 component can not being replaced by other Bogie type components because the specifications are different. This research is done to determine the critical components and its maintenance plan. The method used is reliability centered maintenance (RCM). The result shows that there are 21 components of Bogie K5 that categorized in safety problem, outage problem, economic problem and hidden failure. Brake block component becomes a critical component because it is included in the safety problem component and has the highest RPN (Risk Priority Number) value compared to other components. The RCM action is develop based on conditional directed (CD) and time directed (TD) category. Based on data distribution test for component of brake block, component time to failure is categorized as weibul distribution and component time to repair is categorized as lognormal distribution. The goodness of fit test shows that hypothesis testing is acceptable. For mean time to failures, the average time is 59,44 days, which means that the average component will be damaged after 59,44 days of operation. As for the mean time to repair value is 9,18 days which means that the average time to fix the critical component is 9,18 days.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
印尼商用列车关键部件的可靠性中心维修
转向架是起支撑列车车体基本框架作用的列车部件。印尼商业列车的转向架维修每35万公里至40万公里进行一次。但许多类型的转向架K5在达到35万公里的距离之前就无法运行。转向架K5组件不能被其他转向架类型组件替代,因为规格不同。本文的研究是为了确定关键部件及其维修计划。采用以可靠性为中心的维护方法(RCM)。结果表明,K5转向架存在安全问题、停运问题、经济问题和隐患问题共21个部件。刹车片部件作为安全问题部件,与其他部件相比,具有最高的RPN(风险优先级数),因此成为关键部件。RCM动作是基于条件导向(CD)和时间导向(TD)类别开发的。通过对刹车片部件的数据分布检验,将部件失效时间归为威布尔分布,将部件修复时间归为对数正态分布。拟合优度检验表明假设检验是可以接受的。平均无故障时间为59,44天,这意味着平均部件在运行59,44天后会损坏。平均修复时间为9.18天,即修复关键部件的平均时间为9.18天。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Blade Depth Investigation on Cross-flow Turbine by Numerical Method Metal Oxide Semiconductor Based Electronic Nose as Classification and Prediction Instrument for Nicotine Concentration in Unflavoured Electronic Juice An Improved Implementation of Discretization Algorithm for Markov Reward Models Analysis of the Effects of Overflow Leakage Phenomenon on Archimedes Turbine Efficiency Analysis of Mental Workload in Human Resource Department
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1