Building Information Modeling and Building Knowledge Modeling in Project Management

N. Jasim, H. Aljumaily, I. F. Varouqa, F. Al-Zwainy
{"title":"Building Information Modeling and Building Knowledge Modeling in Project Management","authors":"N. Jasim, H. Aljumaily, I. F. Varouqa, F. Al-Zwainy","doi":"10.24423/CAMES.302","DOIUrl":null,"url":null,"abstract":"Background: The key element for the success of construction projects in the era of technology and information is knowledge. Knowledge management in the construction sector has become a necessary and vital matter, starting with the planning stage, designing, implementing and ending with operation and maintenance stage. One of the most prominent features of knowledge in the construction sector is the building knowledge modeling (BKM). Problem: Although the design stage is considered one of the most important stages of the construction project in terms of eliciting the knowledge element, designers suffer from poor knowledge management, as well as their inability to exploit the capabilities and benefits of building information modeling (BIM), especially knowledge management. Objective: The main aim of this study is to present a conceptual model that integrates the basic principles of knowledge management with contemporary principles of BIM in the design stage and has the ability to store, classify and share the knowledge generated from past designs into future projects. Methodology: The research methodology is constructed on reviewing the pillars of the proposed conceptual model, namely: BKM parameters, BKM library, and BKM clash detection system, then a hypothetical case to prove the validity of the proposed conceptual model using Basmaya residential complex project in the Republic of Iraq is presented as a case study. Results: New four definitions  are introduced: client knowledge, context knowledge, standards knowledge and technical knowledge. The conceptual model proposed in this study has shown great ability and high efficiency in improving and developing knowledge management in the design stage of buildings and projects. In addition, the knowledge stored in the BKM library can be reused in designing new projects in the future. Novelty: The conceptual model has the ability to update constantly itself over time by sharing the knowledge of designers, suppliers and other stakeholders.","PeriodicalId":448014,"journal":{"name":"Computer Assisted Mechanics and Engineering Sciences","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computer Assisted Mechanics and Engineering Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24423/CAMES.302","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Background: The key element for the success of construction projects in the era of technology and information is knowledge. Knowledge management in the construction sector has become a necessary and vital matter, starting with the planning stage, designing, implementing and ending with operation and maintenance stage. One of the most prominent features of knowledge in the construction sector is the building knowledge modeling (BKM). Problem: Although the design stage is considered one of the most important stages of the construction project in terms of eliciting the knowledge element, designers suffer from poor knowledge management, as well as their inability to exploit the capabilities and benefits of building information modeling (BIM), especially knowledge management. Objective: The main aim of this study is to present a conceptual model that integrates the basic principles of knowledge management with contemporary principles of BIM in the design stage and has the ability to store, classify and share the knowledge generated from past designs into future projects. Methodology: The research methodology is constructed on reviewing the pillars of the proposed conceptual model, namely: BKM parameters, BKM library, and BKM clash detection system, then a hypothetical case to prove the validity of the proposed conceptual model using Basmaya residential complex project in the Republic of Iraq is presented as a case study. Results: New four definitions  are introduced: client knowledge, context knowledge, standards knowledge and technical knowledge. The conceptual model proposed in this study has shown great ability and high efficiency in improving and developing knowledge management in the design stage of buildings and projects. In addition, the knowledge stored in the BKM library can be reused in designing new projects in the future. Novelty: The conceptual model has the ability to update constantly itself over time by sharing the knowledge of designers, suppliers and other stakeholders.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
项目管理中的建筑信息建模与建筑知识建模
背景:在技术和信息时代,建筑项目成功的关键因素是知识。从规划阶段、设计、实施到运维阶段,建筑领域的知识管理已经成为一项必要和至关重要的工作。建筑知识建模(BKM)是建筑领域知识最突出的特征之一。问题:虽然设计阶段被认为是建筑项目中最重要的阶段之一,在激发知识元素方面,设计师受到知识管理不善的困扰,以及他们无法利用建筑信息模型(BIM)的能力和好处,特别是知识管理。目的:本研究的主要目的是提出一个概念模型,该模型在设计阶段将知识管理的基本原理与BIM的当代原理相结合,并具有将过去设计中产生的知识存储、分类和共享到未来项目中的能力。研究方法:研究方法建立在回顾所提出的概念模型的支柱上,即:BKM参数、BKM库和BKM冲突检测系统,然后以伊拉克共和国Basmaya住宅综合体项目为例,提出了一个假设案例来证明所提出的概念模型的有效性。结果:引入了客户知识、情境知识、标准知识和技术知识这四个新的定义。本研究提出的概念模型在改善和发展建筑和项目设计阶段的知识管理方面显示出强大的能力和高效率。此外,存储在BKM库中的知识可以在将来设计新项目时重用。新颖性:概念模型有能力通过分享设计师、供应商和其他利益相关者的知识,不断地自我更新。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Image Mining Based on Deep Belief Neural Network and Feature Matching Approach Using Manhattan Distance Designing a Cross Trainer Using an Artificial Neural Network Effect of Thermal Radiation on Biomagnetic Fluid Flow and Heat Transfer over an Unsteady Stretching Sheet A Statistical Comparison of Feature Selection Techniques for Solar Energy Forecasting Based on Geographical Data Using Metamodeling and Fluid-Structure Interaction Analysis in Multi-Objective Optimization of a Butterfly Valve
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1