{"title":"Determination of the Downhole Compensator’s Optimal Power Considering the Cable Line’s Length and Cross Section","authors":"V. Kopyrin, M. Deneko, E. Engel, R. Khamitov","doi":"10.1109/Dynamics50954.2020.9306151","DOIUrl":null,"url":null,"abstract":"Nowadays, reactive power compensation devices are installed on most objects of the fuel and energy complex. However, power’s selection for the compensation devices is an important goal. It is fulfiled in comparison with the cost and the resulting economic effect. The specification of the object’s power supply system should be taken into account. The compensation devices are installed on it. The purpose of the article is to determine the optimal parameters of downhole reactive power compensators. The installation parameters of the electric centrifugal pumps for oil production are considered. The study presents the optimal power’s curves of downhole compensators for submersible asynchronous motors with 110 kW, 125 kW, 140 kW and 160 kW power. The economic effect of reducing active power losses in the supply cable and the annual reduced unit costs are taken into account. According to the proposed method, the optimal power of the downhole compensator for a 125 kW submersible asynchronous electric motor is calculated. It is 105 kVAr for the submersible installation’s selected parameters in oil production area.","PeriodicalId":419225,"journal":{"name":"2020 Dynamics of Systems, Mechanisms and Machines (Dynamics)","volume":"94 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 Dynamics of Systems, Mechanisms and Machines (Dynamics)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/Dynamics50954.2020.9306151","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Nowadays, reactive power compensation devices are installed on most objects of the fuel and energy complex. However, power’s selection for the compensation devices is an important goal. It is fulfiled in comparison with the cost and the resulting economic effect. The specification of the object’s power supply system should be taken into account. The compensation devices are installed on it. The purpose of the article is to determine the optimal parameters of downhole reactive power compensators. The installation parameters of the electric centrifugal pumps for oil production are considered. The study presents the optimal power’s curves of downhole compensators for submersible asynchronous motors with 110 kW, 125 kW, 140 kW and 160 kW power. The economic effect of reducing active power losses in the supply cable and the annual reduced unit costs are taken into account. According to the proposed method, the optimal power of the downhole compensator for a 125 kW submersible asynchronous electric motor is calculated. It is 105 kVAr for the submersible installation’s selected parameters in oil production area.