Analisis Koordinasi Relai Proteksi Transformator I 150/20kV GI Bumicokro Akibat Uprating Daya 50MVA Menjadi 60MVA

Anang Dasa Novfowan, Mochammad Mieftah, Heri Sungkowo
{"title":"Analisis Koordinasi Relai Proteksi Transformator I 150/20kV GI Bumicokro Akibat Uprating Daya 50MVA Menjadi 60MVA","authors":"Anang Dasa Novfowan, Mochammad Mieftah, Heri Sungkowo","doi":"10.33795/elposys.v10i2.2521","DOIUrl":null,"url":null,"abstract":"Nowadays, Electricity is a important thing for people. As the load grown at the Bumicokro Substation, transformer I had replaced from 50 MVA to 60MVA. Because of that, the relays protection had to be resetting because of the changes of nominal current. Therefore, the objectives of this research are calculated and simulated the setting of OCR (Over Current Relay), GFR (Ground Fault Relay), SBEF (Stand by Earth Fault), differential and REF (Resistance Earth Fault) relay. ETAPv12.6 software is used to get the relay coordination Outgoing 22kV, Incoming 150kV, OCR (Over Current Relay), GFR (Ground Fault Relay), SBEF (Stand by Earth Fault), differential and REF (Resistance Earth Fault) after the calculation and simulation finished, then the result indicated the appropriate conditions to overcome the distrubance at the transformer according to the protection zone. The result of current setting for Differential relay is 2,88A, Primary REF is 0,5A, Secondary REF is 1,1A, 150kV OCR is 3,5A, and the moment setting is 28A, 22kV OCR 150kV 4,7A, GFR 1,44A, SBEF 1,0A. While, the result of time setting for Differential relay, Primary REF, Secondary REF are instant, for 150kV OCR is 1,06s, 22kV OCR is 1,07s, GFR 1,51s, and SBEF 8,8s.","PeriodicalId":308262,"journal":{"name":"ELPOSYS: Jurnal Sistem Kelistrikan","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ELPOSYS: Jurnal Sistem Kelistrikan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33795/elposys.v10i2.2521","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Nowadays, Electricity is a important thing for people. As the load grown at the Bumicokro Substation, transformer I had replaced from 50 MVA to 60MVA. Because of that, the relays protection had to be resetting because of the changes of nominal current. Therefore, the objectives of this research are calculated and simulated the setting of OCR (Over Current Relay), GFR (Ground Fault Relay), SBEF (Stand by Earth Fault), differential and REF (Resistance Earth Fault) relay. ETAPv12.6 software is used to get the relay coordination Outgoing 22kV, Incoming 150kV, OCR (Over Current Relay), GFR (Ground Fault Relay), SBEF (Stand by Earth Fault), differential and REF (Resistance Earth Fault) after the calculation and simulation finished, then the result indicated the appropriate conditions to overcome the distrubance at the transformer according to the protection zone. The result of current setting for Differential relay is 2,88A, Primary REF is 0,5A, Secondary REF is 1,1A, 150kV OCR is 3,5A, and the moment setting is 28A, 22kV OCR 150kV 4,7A, GFR 1,44A, SBEF 1,0A. While, the result of time setting for Differential relay, Primary REF, Secondary REF are instant, for 150kV OCR is 1,06s, 22kV OCR is 1,07s, GFR 1,51s, and SBEF 8,8s.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
对变压器I 150/20kV GI bumicock ro的中继保护协调分析将50MVA功率提升到60MVA
如今,电对人们来说是一件重要的事情。随着Bumicokro变电站负荷的增加,1号变压器从50 MVA换成了60MVA。因此,由于标称电流的变化,继电保护必须复位。因此,本研究的目标是计算和模拟OCR(过电流继电器)、GFR(接地故障继电器)、SBEF(备用接地故障)、差动和REF(电阻接地故障)继电器的整定。利用ETAPv12.6软件进行计算和仿真,得到出线22kV、入线150kV、过电流继电器(OCR)、接地故障继电器(GFR)、备用接地故障(SBEF)、差动和电阻接地故障(REF)的继电器协调,并根据保护区域给出克服变压器处扰动的适宜条件。差动继电器电流整定结果为2,88 a,一次REF为0,5a,次REF为1,1a, 150kV OCR为3,5a,力矩整定为28A, 22kV OCR 150kV 4,7 a, GFR 1,44 a, SBEF 1,0a。差动继电器的一次refr、二次refr时间整定结果为瞬间,150kV OCR为1.06 s, 22kV OCR为1.07 s, GFR为1.51 s, SBEF为8.8 s。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analisis Pengaruh Suhu Dan Partial Shading Terhadap Output Daya PV 100-WP Untuk Sistem Hidroponik Analisis Audit Energi di Hotel Kota Malang Menggunakan Web-Based Monitoring System Analisis Kualitas Daya dan Rekomendasi Perbaikan Sistem Kelistrikan di Gedung Perhotelan Analisis Koordinasi Relai Proteksi Transformator I 150/20kV GI Bumicokro Akibat Uprating Daya 50MVA Menjadi 60MVA Audit Energi dan Rekomendasi Penghematan Energi Listrik di Gedung Rumah Sakit
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1