Measurement and control for risk-based test cases and activities

Ellen Souza, C. Gusmão, Keldjan Alves, Julio Venancio, R. Melo
{"title":"Measurement and control for risk-based test cases and activities","authors":"Ellen Souza, C. Gusmão, Keldjan Alves, Julio Venancio, R. Melo","doi":"10.1109/LATW.2009.4813802","DOIUrl":null,"url":null,"abstract":"Risk-based testing is an approach that consists of a set of activities regarding risk factors identification related to software requirements. Once identified, the risks are prioritized according to its likelihood and impact, and the test cases are projected based on the strategies for treatment of the identified risk factors. Then, test efforts are continuously adjusted according the risk monitoring. Most risk-based testing approaches focuses on activities related to risk identification, analysis and prioritizing. However, metrics are fundamental as they quantify characteristics of a process or product and support software project management activities. In this light, this paper proposes and discusses risk-based testing metrics to measure and control test cases and test activities progress, efforts and costs.","PeriodicalId":343240,"journal":{"name":"2009 10th Latin American Test Workshop","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-03-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 10th Latin American Test Workshop","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LATW.2009.4813802","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 21

Abstract

Risk-based testing is an approach that consists of a set of activities regarding risk factors identification related to software requirements. Once identified, the risks are prioritized according to its likelihood and impact, and the test cases are projected based on the strategies for treatment of the identified risk factors. Then, test efforts are continuously adjusted according the risk monitoring. Most risk-based testing approaches focuses on activities related to risk identification, analysis and prioritizing. However, metrics are fundamental as they quantify characteristics of a process or product and support software project management activities. In this light, this paper proposes and discusses risk-based testing metrics to measure and control test cases and test activities progress, efforts and costs.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
对基于风险的测试用例和活动进行测量和控制
基于风险的测试是一种方法,它由一组与软件需求相关的风险因素识别相关的活动组成。一旦确定,风险将根据其可能性和影响进行优先级排序,并且测试用例将基于对确定的风险因素的处理策略进行预测。然后,根据风险监控不断调整测试工作。大多数基于风险的测试方法侧重于与风险识别、分析和确定优先级相关的活动。然而,量度是基本的,因为它们量化了过程或产品的特征,并支持软件项目管理活动。在这种情况下,本文提出并讨论了基于风险的测试度量来度量和控制测试用例和测试活动的进度、努力和成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Test and qualification of a Fault Tolerant FPGA based Active Antenna System for space applications NoC interconnection functional testing: Using boundary-scan to reduce the overall testing time Fault tolerance assessment of PIC microcontroller based on fault injection Using Bulk Built-In Current Sensors and recomputing techniques to mitigate transient faults in microprocessors Study of radiation effects on PIN photodiodes with deep-trap levels using computer modeling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1