{"title":"Adaptive load shedding scheme for transmission line overloading problem in TNB","authors":"Ahmad Zamani, N. Yusuf, M. Sarmin, S. K. S. Abdullah, A. A. Rahim","doi":"10.1109/ISGT-ASIA.2014.6873794","DOIUrl":null,"url":null,"abstract":"Building new infrastructures such as power plants, substations and transmission lines to meet rapid demand growth has becoming more challenging than ever. This is mainly due to economic factor but more importantly is public acceptance. Consequently, transmission grid operation is stressed to the limit and poses significant risks such as transmission line overloading. The overloading problem mostly occurs at congested load areas connection with low rating transmission lines. This paper describes a newly implemented adaptive load shedding scheme to minimize the amount of load loss and its duration due to transmission line overloading. The transmission line overloading detection is based on dynamic line rating and conductor temperature calculation. Quasi-optimum quantum method is used to determine the quantum of load to be shed based on the pre-determined priority of distribution feeders and real time loading. The scheme consists of distributed automation processors, control intelligent electronic devices, synchrophasors and ambient and line temperature sensors.","PeriodicalId":444960,"journal":{"name":"2014 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","volume":"108 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGT-ASIA.2014.6873794","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Building new infrastructures such as power plants, substations and transmission lines to meet rapid demand growth has becoming more challenging than ever. This is mainly due to economic factor but more importantly is public acceptance. Consequently, transmission grid operation is stressed to the limit and poses significant risks such as transmission line overloading. The overloading problem mostly occurs at congested load areas connection with low rating transmission lines. This paper describes a newly implemented adaptive load shedding scheme to minimize the amount of load loss and its duration due to transmission line overloading. The transmission line overloading detection is based on dynamic line rating and conductor temperature calculation. Quasi-optimum quantum method is used to determine the quantum of load to be shed based on the pre-determined priority of distribution feeders and real time loading. The scheme consists of distributed automation processors, control intelligent electronic devices, synchrophasors and ambient and line temperature sensors.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
TNB输电线路过载问题的自适应减载方案
建设新的基础设施,如发电厂、变电站和输电线路,以满足快速增长的需求,变得比以往任何时候都更具挑战性。这主要是由于经济因素,但更重要的是公众的接受程度。因此,输电网的运行受到了极大的压力,并带来了输电线路过载等重大风险。过载问题多发生在负荷密集区与低额定输电线路连接时。本文介绍了一种新的自适应减载方案,以最大限度地减少因输电线路过载而造成的负荷损失和持续时间。传输线过载检测基于动态线路额定值和导线温度计算。采用准最优量子法,根据预先确定的配电馈线优先级和实时负荷,确定分配负荷的量。该方案由分布式自动化处理器、控制智能电子器件、同步相量以及环境和线路温度传感器组成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A measurement technique to identify and locate partial discharge in transformer with AE and HFCT Fast fault recovery of a grid integrated wind farm based HVDC Light transmission system Voltage profile and loss assessment of distribution systems with fixed speed wind generators Industrial CHP optimal management in the energy market under incomplete information A scope for the research and argument activities on electric vehicle development mode in demonstration city
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1