{"title":"Proposing a new mathematical formulation for modeling costs in a p-hub center problem","authors":"M. Rabbani, Saeed Zameni, Seyed Mahmood Kazemi","doi":"10.1109/ICMSAO.2013.6552550","DOIUrl":null,"url":null,"abstract":"Generally, P-hub center problem aims to establish a hub network wherein the maximum travel times between any given pair of nodes is minimized. The distinctive feature of this paper is proposing a new mathematical formulation for modeling costs in a p-hub center problem. Here, instead of seeing costs as a linear function of distance, we, for the first time, formulated costs that consist of different parts: fixed cost, Health, Safety and Environment cost, energy cost and personnel cost. Such an integrated model results in a hard-to-solve nonlinear formulation. For a small scale standard data set the model is solved by Lingo 8.0 software but the area for solving the formulation for large scale instances is yet to be hunted.","PeriodicalId":339666,"journal":{"name":"2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMSAO.2013.6552550","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
Generally, P-hub center problem aims to establish a hub network wherein the maximum travel times between any given pair of nodes is minimized. The distinctive feature of this paper is proposing a new mathematical formulation for modeling costs in a p-hub center problem. Here, instead of seeing costs as a linear function of distance, we, for the first time, formulated costs that consist of different parts: fixed cost, Health, Safety and Environment cost, energy cost and personnel cost. Such an integrated model results in a hard-to-solve nonlinear formulation. For a small scale standard data set the model is solved by Lingo 8.0 software but the area for solving the formulation for large scale instances is yet to be hunted.