Integrated order acceptance and production scheduling with lead time flexibility

Ding Wen-ying, Zhou Hui-Xiu, He Ke-tai
{"title":"Integrated order acceptance and production scheduling with lead time flexibility","authors":"Ding Wen-ying, Zhou Hui-Xiu, He Ke-tai","doi":"10.1109/ICIEA.2017.8283049","DOIUrl":null,"url":null,"abstract":"Order acceptance and production scheduling problem is important in manufacturing industries with limited capacity and many coming orders. In this study, we considered the leadtime flexibility of manufacturers which include setting a due date time window to deliver goods, producing products early before customers' orders arrive or are committed, and completing customers' orders after the agreed due dates. Furthermore, a parameter of importance of order is defined to verify different degree of customers.","PeriodicalId":443463,"journal":{"name":"2017 12th IEEE Conference on Industrial Electronics and Applications (ICIEA)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 12th IEEE Conference on Industrial Electronics and Applications (ICIEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEA.2017.8283049","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Order acceptance and production scheduling problem is important in manufacturing industries with limited capacity and many coming orders. In this study, we considered the leadtime flexibility of manufacturers which include setting a due date time window to deliver goods, producing products early before customers' orders arrive or are committed, and completing customers' orders after the agreed due dates. Furthermore, a parameter of importance of order is defined to verify different degree of customers.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
集成订单接受和生产计划与交货时间的灵活性
在产能有限、订单多的制造业中,订单接受和生产调度问题是一个重要的问题。在本研究中,我们考虑了制造商的交货期灵活性,包括设定到期日交货时间窗口,在客户订单到达或承诺之前提前生产产品,以及在约定的到期日之后完成客户订单。在此基础上,定义了订单重要度参数来验证客户的不同程度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An evolutionary algorithm with 2-D encoding for image segmentation A neural network based place recognition technique for a crowded indoor environment Internet of Things (IoT) in E-commerce: For people with disabilities Predictive analytics for detecting sensor failure using autoregressive integrated moving average model Energy-controlled optimization algorithm for rechargeable unmanned aerial vehicle network
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1