Optimization of unit commitment using parallel structures of genetic algorithm

Hong-Tzer Yang, Pai-Chuan Yang, C. Huang
{"title":"Optimization of unit commitment using parallel structures of genetic algorithm","authors":"Hong-Tzer Yang, Pai-Chuan Yang, C. Huang","doi":"10.1109/EMPD.1995.500791","DOIUrl":null,"url":null,"abstract":"This paper proposes an innovative genetic algorithm (GA) approach to solving the thermal unit commitment (UC) problem using a constraint satisfaction technique. Minimum up-time and down-time constraints on the generating units are embedded in the delicately designed binary strings to represent the on-off states of the units. Ramp rate constraints on the units being started up or shut down are tackled in the economic dispatch subprogram by limiting the associated maximum available capacities for generating. Violations of the other constraints are considered by integrating penalty factors into the cost function. The developed algorithm is further paralleled on an 8-processor transputer network, processors of which are arranged in master-slave and dual-direction ring structures, respectively. The proposed approach is tested on the simple 4 thermal units system and the practical Taiwan Power system of 38 thermal units. Speed-up and efficiency for each structure with different number of processors are compared to those of the sequential GA approach. The proposed approach is shown to be well amenable to parallel implementation.","PeriodicalId":447674,"journal":{"name":"Proceedings 1995 International Conference on Energy Management and Power Delivery EMPD '95","volume":"65 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-11-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 1995 International Conference on Energy Management and Power Delivery EMPD '95","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMPD.1995.500791","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

This paper proposes an innovative genetic algorithm (GA) approach to solving the thermal unit commitment (UC) problem using a constraint satisfaction technique. Minimum up-time and down-time constraints on the generating units are embedded in the delicately designed binary strings to represent the on-off states of the units. Ramp rate constraints on the units being started up or shut down are tackled in the economic dispatch subprogram by limiting the associated maximum available capacities for generating. Violations of the other constraints are considered by integrating penalty factors into the cost function. The developed algorithm is further paralleled on an 8-processor transputer network, processors of which are arranged in master-slave and dual-direction ring structures, respectively. The proposed approach is tested on the simple 4 thermal units system and the practical Taiwan Power system of 38 thermal units. Speed-up and efficiency for each structure with different number of processors are compared to those of the sequential GA approach. The proposed approach is shown to be well amenable to parallel implementation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
利用遗传算法的并行结构优化机组承诺
本文提出了一种基于约束满足技术的遗传算法求解热机组配置问题。发电机组的最小运行时间和停机时间约束嵌入在精心设计的二进制字符串中,以表示机组的开关状态。在经济调度子程序中,通过限制相关的最大可用发电能力来解决机组启动或关闭的斜坡率限制。通过将惩罚因素整合到成本函数中来考虑违反其他约束的情况。该算法在一个8处理器的转发器网络上进行了并行处理,转发器的处理器分别采用主从结构和双向环结构。在简单的4台热机系统和实际的台湾电力38台热机系统上进行了测试。比较了不同处理器数量的结构与顺序遗传算法的速度和效率。结果表明,该方法可以很好地并行实现。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Computer studies of high-voltage motor switching transients A study on the fault indentification of underground cable using neural networks The technical efficiency of developing country electricity systems A method for cost benefit analysis of distribution automation Statistical standards and pollution estimation of harmonics in a power system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1