An Investigation of the Development of Shared Leadership on the Six Sigma Project Life Cycle

B. Galli, M. Kaviani, E. Bottani, T. Murino
{"title":"An Investigation of the Development of Shared Leadership on the Six Sigma Project Life Cycle","authors":"B. Galli, M. Kaviani, E. Bottani, T. Murino","doi":"10.4018/ijitpm.2019100102","DOIUrl":null,"url":null,"abstract":"The purpose of this study is to map out the relationship between shared leadership (SL) and Six Sigma (6S) project lifecycle. More specifically, the impact of SL and team members' perceived challenges in each of the five phases of the DMAIC (define, measure, analyze, improve, and control) 6S methodology is studied. Furthermore, general organizational issues that affect both SL development and the 6S model are identified. The results demonstrate that several factors, namely, change management, communication, phase deliverables, coaching style, and decision-making methods, affect usage performance of SL throughout the phases. This study helps managers to look at the 6S projects from an SL perspective and shows how to manage the 6S project lifecycle more efficiently.","PeriodicalId":375999,"journal":{"name":"Int. J. Inf. Technol. Proj. Manag.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Technol. Proj. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/ijitpm.2019100102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The purpose of this study is to map out the relationship between shared leadership (SL) and Six Sigma (6S) project lifecycle. More specifically, the impact of SL and team members' perceived challenges in each of the five phases of the DMAIC (define, measure, analyze, improve, and control) 6S methodology is studied. Furthermore, general organizational issues that affect both SL development and the 6S model are identified. The results demonstrate that several factors, namely, change management, communication, phase deliverables, coaching style, and decision-making methods, affect usage performance of SL throughout the phases. This study helps managers to look at the 6S projects from an SL perspective and shows how to manage the 6S project lifecycle more efficiently.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
共享领导在六西格玛项目生命周期中的发展研究
本研究的目的是绘制出共享领导(SL)和六西格玛(6S)项目生命周期之间的关系。更具体地说,研究了在DMAIC(定义、测量、分析、改进和控制)6S方法的五个阶段中,SL和团队成员感知到的挑战的影响。此外,还确定了影响SL开发和6S模型的一般组织问题。结果表明,有几个因素,即变更管理、沟通、阶段可交付成果、指导风格和决策方法,会影响整个阶段的SL使用绩效。本研究帮助管理者从SL的角度看待6S项目,并展示了如何更有效地管理6S项目生命周期。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Adapting P2M Framework for Innovation Program Management Through a Lean-Agile Approach Mining Project Failure Indicators From Big Data Using Machine Learning Mixed Methods A Proposal for Research on the Application of AI/ML in ITPM: Intelligent Project Management "Soar" or "Sore": Examining and Reflecting on Bank Performance During Global Financial Crisis - An Indian Scenario FDI Inflow in BRICS and G7: An Empirical Analysis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1