Substantiation of an Economically Feasible Option for Ordering Unmanned Aerial Vehicles for Joint Aviation Groups

Volodymyr Herasymenko, Julia O. Lutsyk, Olexander M. Demenev, V. Mirnenko
{"title":"Substantiation of an Economically Feasible Option for Ordering Unmanned Aerial Vehicles for Joint Aviation Groups","authors":"Volodymyr Herasymenko, Julia O. Lutsyk, Olexander M. Demenev, V. Mirnenko","doi":"10.52566/msu-econ.8(2).2021.117-122","DOIUrl":null,"url":null,"abstract":"This study offers a solution to one of the problems that arise in the routine practice of the Head managers of the Ukrainian Armed Forces and Ministry of Defence – budgetary units when making management decisions. Namely, the search for the most economical (cost saving) option for placing an order between several potential contractors to save budgetary funds, minimise possible risks of exceeding the customer's costs, and organisation of rational spending of financial resources. The purpose of the study is to determine the mechanisms for rapid replenishment of losses of defence products due to the early distribution of defence orders among manufacturers with savings in budgetary funds. To solve the stated problem, an approach was proposed using a statistical method of quantitative risk analysis based on two indicators: the probability of savings and the risk of not receiving the expected savings. An example of using the proposed approach is given for two alternative options for placing an order for unmanned aerial vehicles to create joint aviation groups between three potential contractors. The proposed mechanism for summarising calculations in the final table, acceptable for analysis and allows making the final decision in the management link. In contrast to the approaches used in developed economies, the proposed approach takes into account the capabilities of the manufacturer in terms of production volumes and short deadlines for the production of defence products. Notably, the approach in question can be applied if there are more than two alternative options for the distribution of orders and for more than three potential contractors","PeriodicalId":331060,"journal":{"name":"Scientific Bulletin of Mukachevo State University. Series «Economics»","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Bulletin of Mukachevo State University. Series «Economics»","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52566/msu-econ.8(2).2021.117-122","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This study offers a solution to one of the problems that arise in the routine practice of the Head managers of the Ukrainian Armed Forces and Ministry of Defence – budgetary units when making management decisions. Namely, the search for the most economical (cost saving) option for placing an order between several potential contractors to save budgetary funds, minimise possible risks of exceeding the customer's costs, and organisation of rational spending of financial resources. The purpose of the study is to determine the mechanisms for rapid replenishment of losses of defence products due to the early distribution of defence orders among manufacturers with savings in budgetary funds. To solve the stated problem, an approach was proposed using a statistical method of quantitative risk analysis based on two indicators: the probability of savings and the risk of not receiving the expected savings. An example of using the proposed approach is given for two alternative options for placing an order for unmanned aerial vehicles to create joint aviation groups between three potential contractors. The proposed mechanism for summarising calculations in the final table, acceptable for analysis and allows making the final decision in the management link. In contrast to the approaches used in developed economies, the proposed approach takes into account the capabilities of the manufacturer in terms of production volumes and short deadlines for the production of defence products. Notably, the approach in question can be applied if there are more than two alternative options for the distribution of orders and for more than three potential contractors
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
联合航空集团订购无人机经济可行方案的论证
这项研究为乌克兰武装部队和国防部预算单位的总管理人员在作出管理决策时的日常做法中出现的一个问题提供了解决办法。也就是说,在几个潜在的承包商之间寻找最经济(节省成本)的订单选择,以节省预算资金,最大限度地降低可能超出客户成本的风险,并组织合理的财政资源支出。这项研究的目的是确定迅速补充防务产品损失的机制,这些损失是由于防务订单在制造商之间及早分配而节省预算资金造成的。为了解决上述问题,提出了一种基于储蓄概率和未获得预期储蓄风险两个指标的定量风险分析的统计方法。给出了一个使用所提出方法的示例,用于在三个潜在承包商之间创建联合航空集团的无人机订单的两种备选方案。建议的在最后表格中汇总计算的机制,可用于分析,并允许在管理环节作出最后决定。与发达经济体使用的方法不同,拟议的方法考虑到制造商在生产国防产品的数量和较短期限方面的能力。值得注意的是,如果分配订单有两个以上的备选办法,并且有三个以上的潜在承包商,则可以采用上述方法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Using Baidu Index to Investigate the Spatiotemporal Characteristics of Knowledge Management in China Current Trends in Digital Transformation of Public Administration Perspectives of Implementing Agricultural Land Market in Ukraine within the Context of Reforms of Agrarian Sector Criterial Description of the Measurement of the Circular Bioeconomy Analysis of the Dynamics of Foreign Currency Exchange Rates in Ukraine Including Seasonality Factors and Demand for Domestic Government Loans Bonds (Over 5-10 Years)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1