The automation of an assembly system: A business process re-engineering (BPR) perspective

M. Bevilacqua, F. Ciarapica, Ilaria De Sanctis, G. Mazzuto, C. Paciarotti
{"title":"The automation of an assembly system: A business process re-engineering (BPR) perspective","authors":"M. Bevilacqua, F. Ciarapica, Ilaria De Sanctis, G. Mazzuto, C. Paciarotti","doi":"10.1109/IESM.2015.7380185","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to automate a manual assembly line following a structured framework, in a motorcyclist industry. Process re-engineering is implemented in order to improve and automate the assembly process of a manufacturing company. The transition from the manual process to the new semi-automated assembly line is composed of 4 main steps: the as-is analysis, the Process reengineering and layout design, the training and finally the mass production. The study has shown that the line automation yields significant improvements: sizeable increase of the workstations saturation, better cohesion with Just in Time principles, reduction of the employed working force, and increase of the quality control process rigor. The scope of the study was limited to one of the firm assembly line. In future, the company plans to perform similar studies on the other lines. This investigation shows significant benefit associated with a structured implementation automation in the field of assembly process. The findings will mainly be relevant for process and logistics managers involved in the planning of a new assembly line or in the redesign of an existing one. This paper provides an original case study of as-is analysis, re-design, training and testing of an improved assembly line.","PeriodicalId":308675,"journal":{"name":"2015 International Conference on Industrial Engineering and Systems Management (IESM)","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Industrial Engineering and Systems Management (IESM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IESM.2015.7380185","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The purpose of this paper is to automate a manual assembly line following a structured framework, in a motorcyclist industry. Process re-engineering is implemented in order to improve and automate the assembly process of a manufacturing company. The transition from the manual process to the new semi-automated assembly line is composed of 4 main steps: the as-is analysis, the Process reengineering and layout design, the training and finally the mass production. The study has shown that the line automation yields significant improvements: sizeable increase of the workstations saturation, better cohesion with Just in Time principles, reduction of the employed working force, and increase of the quality control process rigor. The scope of the study was limited to one of the firm assembly line. In future, the company plans to perform similar studies on the other lines. This investigation shows significant benefit associated with a structured implementation automation in the field of assembly process. The findings will mainly be relevant for process and logistics managers involved in the planning of a new assembly line or in the redesign of an existing one. This paper provides an original case study of as-is analysis, re-design, training and testing of an improved assembly line.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
装配系统的自动化:业务流程再工程(BPR)的视角
本文的目的是自动化的人工装配线遵循一个结构化的框架,在摩托车行业。流程再造是为了改进和自动化制造公司的装配过程而实施的。从手工流程到新的半自动化装配线的过渡由4个主要步骤组成:现状分析、流程再造和布局设计、培训和最后的批量生产。研究表明,生产线自动化产生了显著的改善:工作站饱和度大幅增加,更好地与准时制原则相结合,减少了雇佣的劳动力,提高了质量控制过程的严谨性。研究的范围仅限于公司的一条装配线。未来,该公司计划在其他生产线上进行类似的研究。这项调查显示了与装配过程领域的结构化实现自动化相关的显著好处。调查结果将主要与参与规划新的装配线或重新设计现有装配线的过程和后勤管理人员有关。本文提供了一个原始案例研究的现状分析,重新设计,培训和测试的改进装配线。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Cost and benefit analysis of supplier risk mitigation in an aerospace Supply chain Modelling project complexity driven risk paths in new product development Evaluation of control strategies for managing supply chain risks using Bayesian Belief Networks Stability around the hyper-LSP in French distribution channel: a “prey-predator” modeling Relationships between national culture and Lean Management: A literature Review
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1