Modeling of liquid unloading using coiled tubing in horizontal gas wells

S. Madani, S. Sokhoshko
{"title":"Modeling of liquid unloading using coiled tubing in horizontal gas wells","authors":"S. Madani, S. Sokhoshko","doi":"10.31660/0445-0108-2022-4-103-118","DOIUrl":null,"url":null,"abstract":"This article studies the flow simulation for liquid unloading using coiled tubing in horizontal gas wells. A semianalytical reservoir model, coupled with a wellbore model under nonisothermal, steady state conditions is used to calculate the distribution of gas velocity along the wellbore. The coupled model takes into account the effect of the wellbore trajectory type on the well performance. The minimum gas velocity for liquid removal is calculated using a model adapted for horizontal gas wells. An algorithm has been presented to estimate the well performance and the liquid unloading for different CT diameters, at various wellbore positions. The simulation results showed that the installation of 53.51 mm or 65.1 mm diameter coiled tubing at the toe ensure a good liquid unloading and optimum well performance.","PeriodicalId":240239,"journal":{"name":"Oil and Gas Studies","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Oil and Gas Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31660/0445-0108-2022-4-103-118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This article studies the flow simulation for liquid unloading using coiled tubing in horizontal gas wells. A semianalytical reservoir model, coupled with a wellbore model under nonisothermal, steady state conditions is used to calculate the distribution of gas velocity along the wellbore. The coupled model takes into account the effect of the wellbore trajectory type on the well performance. The minimum gas velocity for liquid removal is calculated using a model adapted for horizontal gas wells. An algorithm has been presented to estimate the well performance and the liquid unloading for different CT diameters, at various wellbore positions. The simulation results showed that the installation of 53.51 mm or 65.1 mm diameter coiled tubing at the toe ensure a good liquid unloading and optimum well performance.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
水平井连续油管卸液建模
研究了水平井连续油管卸液过程的流动模拟。采用半解析油藏模型,结合非等温稳态条件下的井筒模型,计算了沿井筒的气速分布。耦合模型考虑了井眼轨迹类型对井眼动态的影响。采用适用于水平气井的模型,计算了除液的最小气速。提出了一种算法来估计不同连续油管直径、不同井眼位置的井况和卸液量。仿真结果表明,在趾部分别安装53.51 mm和65.1 mm直径的连续油管,可以保证良好的排液效果和最佳的井效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Study of phase evolution and microstructural features when modeling operating conditions of fuel cells based on lanthanum-strontium ferrite compounds The quality of circulating water and its impact on the operation of heat exchange equipment at petrochemical enterprises Experience in seismic facies analysis application during prospecting and exploration A forecast of the gas saturation factor in the NB1 layer of Upper Cretaceous deposits within the Nadym-Pur-Taz region of West Siberia Modern approaches to the justification of zones with different saturation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1