{"title":"Conditions of contract","authors":"F. Furkert","doi":"10.4324/9780203302651-24","DOIUrl":null,"url":null,"abstract":"Anything I might say about the conditions of contract used in connection with engineering works could hardly escape the charge of plagiarism in view of the exhaustive paper on this subject contributed to the Proceedings of the Institution of Civil Engineers by E. J. Rimmer and published in 1939.","PeriodicalId":287707,"journal":{"name":"New Zealand Engineering","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1948-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"New Zealand Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4324/9780203302651-24","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Anything I might say about the conditions of contract used in connection with engineering works could hardly escape the charge of plagiarism in view of the exhaustive paper on this subject contributed to the Proceedings of the Institution of Civil Engineers by E. J. Rimmer and published in 1939.