{"title":"Analysis of Contact Resistance Test for PMT Bay Kuningan II 70KV at Sunyaragi Substation","authors":"Rezza Badruzzaman, Arnisa Stefanie","doi":"10.21070/jeeeu.v5i2.1396","DOIUrl":null,"url":null,"abstract":"Electrical energy is included in the primary needs of humans in this era, where in this modern era, almost all equipment is electronic based so that the need for electrical energy is very large. In Indonesia, there is a company that is in charge and responsible for processing and distributing electricity to the public, namely PLN or more specifically the Substation. To distribute electricity at this substation, there are primary equipment that functions as a transmission regulator, one of which is a power breaker (PMT). PMT is one of the important assets in the reliability of the electricity system at the substation, so periodic testing and maintenance is very necessary. Testing and maintenance on PMT are very diverse from insulation resistance testing, simultaneous testing (Breaker Analyzer), SF6 gas characteristic testing, and PMT contact resistance testing. This contact resistance test is carried out to determine the resistance value of the PMT contact, from the resistance value obtained it can also be seen for the value of the power loss generated by the PMT when operating.","PeriodicalId":320287,"journal":{"name":"JEEE-U (Journal of Electrical and Electronic Engineering-UMSIDA)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JEEE-U (Journal of Electrical and Electronic Engineering-UMSIDA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21070/jeeeu.v5i2.1396","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Electrical energy is included in the primary needs of humans in this era, where in this modern era, almost all equipment is electronic based so that the need for electrical energy is very large. In Indonesia, there is a company that is in charge and responsible for processing and distributing electricity to the public, namely PLN or more specifically the Substation. To distribute electricity at this substation, there are primary equipment that functions as a transmission regulator, one of which is a power breaker (PMT). PMT is one of the important assets in the reliability of the electricity system at the substation, so periodic testing and maintenance is very necessary. Testing and maintenance on PMT are very diverse from insulation resistance testing, simultaneous testing (Breaker Analyzer), SF6 gas characteristic testing, and PMT contact resistance testing. This contact resistance test is carried out to determine the resistance value of the PMT contact, from the resistance value obtained it can also be seen for the value of the power loss generated by the PMT when operating.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Sunyaragi变电站70KV PMT Bay Kuningan II接触电阻试验分析
在这个时代,电能被包括在人类的主要需求中,在这个现代时代,几乎所有的设备都是以电子为基础的,因此对电能的需求非常大。在印度尼西亚,有一家公司负责处理和分配电力给公众,即PLN,或者更具体地说,是变电站。为了在该变电站分配电力,有作为传输调节器的主要设备,其中之一是电源断路器(PMT)。PMT是变电站电力系统可靠性的重要资产之一,因此定期检测和维护是非常必要的。PMT的测试和维护非常多样化,从绝缘电阻测试,同时测试(断路器分析仪),SF6气体特性测试和PMT接触电阻测试。进行此接触电阻测试是为了确定PMT触点的电阻值,从所获得的电阻值也可以看出PMT在工作时产生的功率损耗值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Leak Monitoring in Split Duct Air Conditioner Based on Internet of Things Design of a Height and Weight Measurement Tool for Toddlers at Spreadsheet-Based Posyandu The Protection Relay Coordination Studies (Over Current Relays and Ground Fault Relays) On The Power Plant Electrical System, PT. Rekind Daya Mamuju By Using The ETAP 12.6 Program Design of Atmega2560 Charge Controller Battery Using Static Bicycle Sistem Monitoring Dan Kontrol Motor Listrik Industri Menggunakan Internet Of Things (IoT)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1