{"title":"Optimization of the infrastructure of the distributed information system of goods accounting","authors":"Oleh Faizulin, Yaroslav Kis","doi":"10.23939/sisn2022.12.219","DOIUrl":null,"url":null,"abstract":"An existing goods accounting information system was assessed for possible infrastructure optimization. A various parts of the system were analyzed to improve infrastructure costs without having a significant degradation of non-functional requirements. Modeling of the optimized system was performed, and evaluation of the infrastructure costs was made. Several optimization directions were evaluated, analyzed and either recommended or rejected. As the result, the final information system model was designed which allows to achieve significant infrastructure cost savings by applying multiple optimizations.","PeriodicalId":444399,"journal":{"name":"Vìsnik Nacìonalʹnogo unìversitetu \"Lʹvìvsʹka polìtehnìka\". Serìâ Ìnformacìjnì sistemi ta merežì","volume":"2016 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Vìsnik Nacìonalʹnogo unìversitetu \"Lʹvìvsʹka polìtehnìka\". Serìâ Ìnformacìjnì sistemi ta merežì","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23939/sisn2022.12.219","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
An existing goods accounting information system was assessed for possible infrastructure optimization. A various parts of the system were analyzed to improve infrastructure costs without having a significant degradation of non-functional requirements. Modeling of the optimized system was performed, and evaluation of the infrastructure costs was made. Several optimization directions were evaluated, analyzed and either recommended or rejected. As the result, the final information system model was designed which allows to achieve significant infrastructure cost savings by applying multiple optimizations.