{"title":"IMPLEMENTATION OF PSC COST RECOVERY AND PSC GROSS SPLIT CONTRACTS IN THE IYP FIELD","authors":"I. Pratama, B. Satiyawira, P. S. Yulia","doi":"10.25105/petro.v12i2.16096","DOIUrl":null,"url":null,"abstract":"In producing oil and gas, Indonesia has two valid contract schemes, namely PSC Cost Recovery and PSC Gross Split. The IYP field is a field that has great potential in producing petroleum, with 25 workover and 2 infill wells. The scheme released to compare with the PSC Cost Recovery scheme is the Gross Split PSC scheme. The previous scheme was considered to be ineffective and still detrimental to the government. So the government issued Ministerial Regulation No. 52 of 2017 which is the result of a revision of Permen no. 8 of 2017. Gross Split PSC Scheme, the contractor bears all operational costs for the development of oil and gas fields. The economic research on the IYP field aims to compare the Cost Recovery PSC scheme with the Gross Split PSC.","PeriodicalId":435945,"journal":{"name":"PETRO:Jurnal Ilmiah Teknik Perminyakan","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PETRO:Jurnal Ilmiah Teknik Perminyakan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/petro.v12i2.16096","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In producing oil and gas, Indonesia has two valid contract schemes, namely PSC Cost Recovery and PSC Gross Split. The IYP field is a field that has great potential in producing petroleum, with 25 workover and 2 infill wells. The scheme released to compare with the PSC Cost Recovery scheme is the Gross Split PSC scheme. The previous scheme was considered to be ineffective and still detrimental to the government. So the government issued Ministerial Regulation No. 52 of 2017 which is the result of a revision of Permen no. 8 of 2017. Gross Split PSC Scheme, the contractor bears all operational costs for the development of oil and gas fields. The economic research on the IYP field aims to compare the Cost Recovery PSC scheme with the Gross Split PSC.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在iyp领域实施PSC成本回收和PSC总分割合同
在生产石油和天然气方面,印度尼西亚有两种有效的合同方案,即PSC成本回收和PSC Gross Split。IYP油田拥有25口修井井和2口填充井,是一个极具开发潜力的油田。与PSC成本回收计划比较的计划是Gross Split PSC计划。先前的计划被认为是无效的,而且仍然对政府有害。因此,政府发布了2017年第52号部长条例,这是对第52号永久条例进行修订的结果。2017年第8号。根据Gross Split PSC方案,承包商承担油气田开发的所有运营成本。国际年计划领域的经济研究旨在比较成本回收PSC方案与总分割PSC方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PENGARUH PENAMBAHAN BUBUK KULIT PISANG TERHADAP FILTRATION LOSS DAN MUD CAKE PADA LUMPUR BERBAHAN DASAR AIR TAWAR UNTUK TEMPERATUR 80oF DAN 200oF EVALUASI PENANGGULANGAN LOST CIRCULATION LAPANGAN X IMPLEMENTATION OF PSC COST RECOVERY AND PSC GROSS SPLIT CONTRACTS IN THE IYP FIELD STUDY OF PERMEABILITY PREDICTION USING HYDRAULIC FLOW UNIT (HFU) AND MACHINE LEARNING METHOD IN “BSH” FIELD USULAN REPERFORASI SUMUR S UNTUK OPTIMASI PRODUKSI
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1