{"title":"Using Analytics to Optimize M&TE Inventory - a Case Study","authors":"Dean S. Williams","doi":"10.51843/wsproceedings.2017.10","DOIUrl":null,"url":null,"abstract":"This paper describes a case study involving an inventory optimization pilot project that used analytics as a key to identifying and managing inventory levels for a measuring and test equipment program. This paper highlights the approach taken and the analytical tools used to execute that strategy. The approach follows the general guidelines of a LEAN improvement project using DMAIC(Define, Measure, Analyze, Implement, Control) The paper concludes with a summary of results from the pilot project, some lessons learned, anticipated next steps for full-scale implementation, and estimates of potential overall savings.","PeriodicalId":432978,"journal":{"name":"NCSL International Workshop & Symposium Conference Proceedings 2017","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"NCSL International Workshop & Symposium Conference Proceedings 2017","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51843/wsproceedings.2017.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper describes a case study involving an inventory optimization pilot project that used analytics as a key to identifying and managing inventory levels for a measuring and test equipment program. This paper highlights the approach taken and the analytical tools used to execute that strategy. The approach follows the general guidelines of a LEAN improvement project using DMAIC(Define, Measure, Analyze, Implement, Control) The paper concludes with a summary of results from the pilot project, some lessons learned, anticipated next steps for full-scale implementation, and estimates of potential overall savings.