Analisis Kestabilan Transien Akibat Penambahan Generator di Pabrik Gula

Rohmanita Duanaputri, Muhammad Fahmi Hakim, Reyhan Aulia Rachman, Nuha Nadhiroh
{"title":"Analisis Kestabilan Transien Akibat Penambahan Generator di Pabrik Gula","authors":"Rohmanita Duanaputri, Muhammad Fahmi Hakim, Reyhan Aulia Rachman, Nuha Nadhiroh","doi":"10.33795/elposys.v10i2.3064","DOIUrl":null,"url":null,"abstract":"The Assembagoes sugar factory has a production capacity of 3000 TCD and was revitalized in 2015, increasing the capacity to 6000 TCD. With the increase in production capacity, the supply of electrical energy, which had previously only come from one generator unit, was supplemented with one new 13 MW generator unit, increasing the total generation capacity to 23 MW. With this addition, the operation pattern of the electrical system changes, and the problem of system stability becomes one of the primary concerns that must be analyzed with improvements to the Assembaggoes sugar factory's electrical system. The goal of this research is to determine the system's frequency and voltage response when a brief stability disturbance occurs.","PeriodicalId":308262,"journal":{"name":"ELPOSYS: Jurnal Sistem Kelistrikan","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ELPOSYS: Jurnal Sistem Kelistrikan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33795/elposys.v10i2.3064","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Assembagoes sugar factory has a production capacity of 3000 TCD and was revitalized in 2015, increasing the capacity to 6000 TCD. With the increase in production capacity, the supply of electrical energy, which had previously only come from one generator unit, was supplemented with one new 13 MW generator unit, increasing the total generation capacity to 23 MW. With this addition, the operation pattern of the electrical system changes, and the problem of system stability becomes one of the primary concerns that must be analyzed with improvements to the Assembaggoes sugar factory's electrical system. The goal of this research is to determine the system's frequency and voltage response when a brief stability disturbance occurs.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
糖厂发电机增补的Transien稳定性分析
Assembagoes糖厂的生产能力为3000 TCD,并于2015年重新焕发活力,将产能提高到6000 TCD。随着生产能力的增加,以前仅由一个发电机组提供的电能供应得到了一个新的13兆瓦发电机组的补充,使总发电能力增加到23兆瓦。随着这一增加,电气系统的运行模式发生了变化,系统稳定性问题成为必须分析的主要问题之一,并对Assembaggoes糖厂的电气系统进行改进。本研究的目的是确定系统的频率和电压响应时,一个短暂的稳定扰动发生。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analisis Pengaruh Suhu Dan Partial Shading Terhadap Output Daya PV 100-WP Untuk Sistem Hidroponik Analisis Audit Energi di Hotel Kota Malang Menggunakan Web-Based Monitoring System Analisis Kualitas Daya dan Rekomendasi Perbaikan Sistem Kelistrikan di Gedung Perhotelan Analisis Koordinasi Relai Proteksi Transformator I 150/20kV GI Bumicokro Akibat Uprating Daya 50MVA Menjadi 60MVA Audit Energi dan Rekomendasi Penghematan Energi Listrik di Gedung Rumah Sakit
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1