{"title":"Multi-objective Monthly Generation Scheduling Considering the Supply Constraints of Adjustable Energy","authors":"Alanazi Hani Owaid S","doi":"10.1109/ACFPE56003.2022.9952245","DOIUrl":null,"url":null,"abstract":"With power plant departing with power network, coal load of thermal plants and water storage of hydropower plants are not considered in some literatures, which may results to insufficient energy sources when making monthly generation scheduling. A multi-objective monthly generation scheduling considering the supply constraints of energy is proposed. This model with minimum monthly electricity deviation, the cost of generating electricity and the amount of waste water as the objective, and the linear constraints between water and electricity, coal and electricity, the supply constraints of water and coal and power balance constraints and so on are considered comprehensively. For solving the multi-objective model quickly, the normal boundary intersection method is used to transform the multi-objective problem into a series of single-objective problems, and the large-scale mixed integer linear programming problem is solved by commercial software CPLEX. After obtaining a series of Pareto's optimum solutions, the optimal solution is obtained by combining the entropy weight method considering subjective weight with the double base point method, which provides a reference for making monthly generation scheduling. The example results on a provincial power system show that the proposed model can fully take into account the constraints of energy sources, as well as, making the scheduling scheme more reasonable and executable.","PeriodicalId":198086,"journal":{"name":"2022 Asian Conference on Frontiers of Power and Energy (ACFPE)","volume":"16 2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 Asian Conference on Frontiers of Power and Energy (ACFPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACFPE56003.2022.9952245","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

With power plant departing with power network, coal load of thermal plants and water storage of hydropower plants are not considered in some literatures, which may results to insufficient energy sources when making monthly generation scheduling. A multi-objective monthly generation scheduling considering the supply constraints of energy is proposed. This model with minimum monthly electricity deviation, the cost of generating electricity and the amount of waste water as the objective, and the linear constraints between water and electricity, coal and electricity, the supply constraints of water and coal and power balance constraints and so on are considered comprehensively. For solving the multi-objective model quickly, the normal boundary intersection method is used to transform the multi-objective problem into a series of single-objective problems, and the large-scale mixed integer linear programming problem is solved by commercial software CPLEX. After obtaining a series of Pareto's optimum solutions, the optimal solution is obtained by combining the entropy weight method considering subjective weight with the double base point method, which provides a reference for making monthly generation scheduling. The example results on a provincial power system show that the proposed model can fully take into account the constraints of energy sources, as well as, making the scheduling scheme more reasonable and executable.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
考虑可调能源供应约束的多目标月度发电计划
在电厂脱离电网的情况下,一些文献没有考虑火电厂的煤负荷和水电厂的蓄水量,在制定月度发电计划时可能会出现能源不足的情况。提出了一种考虑能源供应约束的多目标月度发电计划。该模型以月电量偏差最小为目标,以发电成本和废水量为目标,综合考虑了水电、煤电、水煤供给约束和电力平衡约束等线性约束。为了快速求解多目标模型,采用法向边界相交法将多目标问题转化为一系列单目标问题,并利用商业软件CPLEX求解大规模混合整数线性规划问题。在得到一系列Pareto最优解后,将考虑主观权重的熵权法与双基点法相结合,得到最优解,为月度发电调度提供参考。在某省级电力系统上的算例结果表明,该模型能够充分考虑能源约束,使调度方案更加合理和可执行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Projection Method of Energy Storage System in Power Spot Market for Renewable Accommodation A Copeland-Method-based Weakness Identification for the Components in Transmission Systems Under Natural Disasters Optimization Clearing Model of Regional Integrated Electricity Market Transaction in the Dual Track System of Planning and Market Mechanism analysis of power fluctuation of wind power AC transmission channel caused by DC commutation failure Research on energy regulation strategy of six-phase motor for multi-mode combined propulsion system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1