Engineering Materials Management Pattern Research and Implementation for Generation III Nuclear Power Plant

Tingzhou. Wu, Jia-Shu Xu, Zhi-Feng Tan
{"title":"Engineering Materials Management Pattern Research and Implementation for Generation III Nuclear Power Plant","authors":"Tingzhou. Wu, Jia-Shu Xu, Zhi-Feng Tan","doi":"10.1109/IBICA.2011.77","DOIUrl":null,"url":null,"abstract":"The construction of a nuclear power plant is a very complex systematic project, mainly including engineering, procurement, construction and start-up phases. Among those stages, engineering materials management is a fundamental and decisive job. In this paper, the engineering materials' properties are researched. In order to manage the engineering materials in VPRM efficiently, we proposed the nuclear power plant engineering materials classification method, and developed three kinds of workflow based on VPRM, effectively solved the problems of engineering materials management of the third generation nuclear power plant. In the paper an example of the third generation nuclear power plant engineering materials management application is given, which namely the Taishan Nuclear Power Plant Engineering Management System.","PeriodicalId":158080,"journal":{"name":"2011 Second International Conference on Innovations in Bio-inspired Computing and Applications","volume":"208 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Second International Conference on Innovations in Bio-inspired Computing and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IBICA.2011.77","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The construction of a nuclear power plant is a very complex systematic project, mainly including engineering, procurement, construction and start-up phases. Among those stages, engineering materials management is a fundamental and decisive job. In this paper, the engineering materials' properties are researched. In order to manage the engineering materials in VPRM efficiently, we proposed the nuclear power plant engineering materials classification method, and developed three kinds of workflow based on VPRM, effectively solved the problems of engineering materials management of the third generation nuclear power plant. In the paper an example of the third generation nuclear power plant engineering materials management application is given, which namely the Taishan Nuclear Power Plant Engineering Management System.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
第三代核电站工程材料管理模式研究与实施
核电站建设是一个非常复杂的系统工程,主要包括工程设计、采购、施工和启动阶段。其中,工程材料管理是一项基础性、决定性的工作。本文对工程材料的性能进行了研究。为了在VPRM中高效地管理工程材料,提出了核电站工程材料分类方法,并基于VPRM开发了三种工作流程,有效地解决了第三代核电站工程材料管理问题。本文给出了第三代核电站工程材料管理应用实例,即泰山核电站工程材料管理系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fighting Detection Based on Optical Flow Context Histogram Some Researches for Lorenz-Based Secure Communication in Time and Frequency Domains A Cognitive Model to Mimic an Aspect of Low Level Perception of Sound: Modelling Reverberation Perception by Statistical Signal Analysis The Sustained Exhilarating Cardiac Responses after Listening to the Very Fast and Complex Rhythm Smart Classroom Roll Caller System with IOT Architecture
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1