Dependence of Military Bridge Length and Parameters Defining its Manufacturing Costs

Peter Mako
{"title":"Dependence of Military Bridge Length and Parameters Defining its Manufacturing Costs","authors":"Peter Mako","doi":"10.52651/sam.a.2022.1.5-13","DOIUrl":null,"url":null,"abstract":"Knowledge of dependence between the length of the bridge and parameters which are defining the costs for its production can be extraordinary valuable for making decisions during planning, procurement or any other inhouse processes of manufacturers of this equipment. This article is expressing graphical and functional dependence between the bridge length and the basic parameters which are defining manufacturing costs of the bridges. Presented functions allow to predict parameters defining manufacturing costs for bridges which are out of the scope of this article also.","PeriodicalId":282324,"journal":{"name":"Science & Military","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Science & Military","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52651/sam.a.2022.1.5-13","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Knowledge of dependence between the length of the bridge and parameters which are defining the costs for its production can be extraordinary valuable for making decisions during planning, procurement or any other inhouse processes of manufacturers of this equipment. This article is expressing graphical and functional dependence between the bridge length and the basic parameters which are defining manufacturing costs of the bridges. Presented functions allow to predict parameters defining manufacturing costs for bridges which are out of the scope of this article also.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
军用桥梁长度的依赖关系及其制造成本的参数定义
桥架长度和决定其生产成本的参数之间的依赖关系的知识对于在规划、采购或该设备制造商的任何其他内部流程中做出决策非常有价值。这篇文章表达了桥梁长度和基本参数之间的图形关系和函数关系,这些参数决定了桥梁的制造成本。所提供的函数允许预测定义桥梁制造成本的参数,这也超出了本文的范围。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Relevant Tasks for UAV Protection Systems in Relation to the Aerial Scenario of Nuclear Facilities The Impact of Technological Changes on the Development of Military Leaders Measurement of the Resolution of the Mounted Periscope of the Armoured Vehicle Evaluation of Engine Oil Degradation (MO) Shell Helix HX-8, Sae 5W-30 on BMW 330d Xdrive Methods for Determining the Risk Factors for Road Transit in Hungary
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1