Enabling Lean Among Small and Medium Enterprise (SME) Contractors in Sri Lanka

K. Ranadewa, Y. Sandanayake, M. Siriwardena
{"title":"Enabling Lean Among Small and Medium Enterprise (SME) Contractors in Sri Lanka","authors":"K. Ranadewa, Y. Sandanayake, M. Siriwardena","doi":"10.24928/2018/0428","DOIUrl":null,"url":null,"abstract":"Lack of sufficient attention to the possible benefits of adopting lean concept has hindered the performance of small and medium enterprise (SME) contractors in Sri Lanka. Insufficient knowledge on minimising non-value adding activities (NVAA) is considered as the major barrier to implementing lean. Moreover, there is a lack of empirical research identifying NVAA, in order to trigger lean adoption in Sri Lankan SME contractors. Hence, the paper investigates NVAA, their significance and the causes, which hinder lean implementation in Sri Lankan SME contractors. A literature review, followed by five case studies were carried out, and the data were analysed using 5-why analysis. According to findings, lean construction is still a relatively unfamiliar approach among SME contractors in Sri Lanka. Some organisations follow lean techniques in an ad-hoc manner without an adequate understanding of the concept. The studyfurther identified defects, inventory and waiting as major NVAA categories relevant to SME contractors. Lack of finance, insufficient training, cultural inertia, lack of individual capacities, lack of networking and collaboration, and lack of action learning were identified as the root causes for NVAA of SME contractors. Although respondents expressed their willingness to implement lean to enhance value, they identified lack of capacities as a major constraint against enabling lean adoption among SME contractors in Sri Lanka.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0428","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Lack of sufficient attention to the possible benefits of adopting lean concept has hindered the performance of small and medium enterprise (SME) contractors in Sri Lanka. Insufficient knowledge on minimising non-value adding activities (NVAA) is considered as the major barrier to implementing lean. Moreover, there is a lack of empirical research identifying NVAA, in order to trigger lean adoption in Sri Lankan SME contractors. Hence, the paper investigates NVAA, their significance and the causes, which hinder lean implementation in Sri Lankan SME contractors. A literature review, followed by five case studies were carried out, and the data were analysed using 5-why analysis. According to findings, lean construction is still a relatively unfamiliar approach among SME contractors in Sri Lanka. Some organisations follow lean techniques in an ad-hoc manner without an adequate understanding of the concept. The studyfurther identified defects, inventory and waiting as major NVAA categories relevant to SME contractors. Lack of finance, insufficient training, cultural inertia, lack of individual capacities, lack of networking and collaboration, and lack of action learning were identified as the root causes for NVAA of SME contractors. Although respondents expressed their willingness to implement lean to enhance value, they identified lack of capacities as a major constraint against enabling lean adoption among SME contractors in Sri Lanka.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在斯里兰卡中小企业(SME)承包商中实现精益
对采用精益理念可能带来的好处缺乏足够的重视,阻碍了斯里兰卡中小企业(SME)承包商的绩效。对最小化非增值活动(NVAA)的知识不足被认为是实施精益的主要障碍。此外,还缺乏实证研究来确定NVAA,以触发斯里兰卡中小企业承包商的精益采用。因此,本文对阻碍斯里兰卡中小企业承包商精益实施的NVAA、NVAA的意义和原因进行了研究。文献综述,随后进行了五个案例研究,并使用5-why分析法分析数据。根据调查结果,精益建设在斯里兰卡的中小企业承包商中仍然是一种相对陌生的方法。一些组织在没有充分理解精益概念的情况下,以一种特别的方式遵循精益技术。该研究进一步确定了缺陷、库存和等待是与中小企业承包商相关的主要NVAA类别。缺乏资金、培训不足、文化惰性、缺乏个人能力、缺乏网络和协作以及缺乏行动学习被确定为中小企业承包商NVAA的根本原因。尽管受访者表示他们愿意实施精益以提高价值,但他们认为缺乏能力是斯里兰卡中小企业承包商采用精益的主要制约因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Enhancing Labour Productivity in Petrochemical Construction and Maintenance Projects Complex Production Systems: Non-Linear and Non-Repetitive Projects Towards Facility Management Participation in Design: A UCSF Case Study Project Delivery Through Lean Principles Across All Disciplnes of Construction in a Developing Country Environment Short Takt Time in Construction – a Practical Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1