Application of Lean Manufacturing Techniques in a Peruvian Plastic Company

Ivonne Poves-Calderno, J. Ramirez-Mendoza, Victor Nuñez-Ponce, J. Alvarez-Merino
{"title":"Application of Lean Manufacturing Techniques in a Peruvian Plastic Company","authors":"Ivonne Poves-Calderno, J. Ramirez-Mendoza, Victor Nuñez-Ponce, J. Alvarez-Merino","doi":"10.1109/IEEM44572.2019.8978813","DOIUrl":null,"url":null,"abstract":"This study analyzes the influence of nonfulfillment of orders in a company that produces plastic sheets. The main cause of problems is the long unproductive times during the extrusion process, which decrease the index of the overall equipment effectiveness (OEE). An innovative proposal is presented to address this issue, involving the use of a systematic approach and combining the SMED and preventive maintenance techniques of the lean manufacturing methodology, with the aim of reducing unproductive times to improve the OEE index. To validate the effectiveness of the proposal, the systems were simulated using Arena simulation software and input analyzer, to determine the reduction of unproductive times. Results show that the proposal reduces the unproductive times bh 36.37% and improves the OEE index by 9.02%. This demonstrates the achievement of the objective of the project, which was to maximize the efficiency of the process and reduce the total time of the extrusion process, which will allow the company to fulfill the orders and avoid profit losses.","PeriodicalId":255418,"journal":{"name":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM44572.2019.8978813","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

This study analyzes the influence of nonfulfillment of orders in a company that produces plastic sheets. The main cause of problems is the long unproductive times during the extrusion process, which decrease the index of the overall equipment effectiveness (OEE). An innovative proposal is presented to address this issue, involving the use of a systematic approach and combining the SMED and preventive maintenance techniques of the lean manufacturing methodology, with the aim of reducing unproductive times to improve the OEE index. To validate the effectiveness of the proposal, the systems were simulated using Arena simulation software and input analyzer, to determine the reduction of unproductive times. Results show that the proposal reduces the unproductive times bh 36.37% and improves the OEE index by 9.02%. This demonstrates the achievement of the objective of the project, which was to maximize the efficiency of the process and reduce the total time of the extrusion process, which will allow the company to fulfill the orders and avoid profit losses.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
精益生产技术在秘鲁一家塑料公司的应用
本研究分析了某塑胶薄板生产企业订单不履行的影响。造成问题的主要原因是挤压过程中非生产性时间长,降低了设备整体效率(OEE)指标。为了解决这个问题,提出了一个创新的建议,包括使用系统的方法,并将SMED和精益制造方法的预防性维护技术相结合,目的是减少非生产性时间,以提高OEE指数。为了验证该建议的有效性,使用Arena仿真软件和输入分析仪对系统进行了模拟,以确定减少非生产时间。结果表明,该方案可减少36.37%的非生产次数,提高9.02%的综合利用效率。这证明了项目目标的实现,即最大限度地提高工艺效率,减少挤压过程的总时间,这将使公司能够完成订单并避免利润损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Locating Humanitarian Relief Effort Facility Using P-Center Method A Method of Fault Identification Considering High Fix Priority in Open Source Project Model-based Systems Engineering Process for Supporting Variant Selection in the Early Product Development Phase A Method of Parameter Estimation in Flexible Jump Diffusion Process Models for Open Source Maintenance Effort Management Kanban-CONWIP Hybrid Model for Improving Productivity of an Electrostatic Coating Process
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1