Short-term hydro generation and interchange contract scheduling for Swiss Rail

M. Christoforidis, B. Awobamise, S. Tong, R. Frowd, F. Rahimi
{"title":"Short-term hydro generation and interchange contract scheduling for Swiss Rail","authors":"M. Christoforidis, B. Awobamise, S. Tong, R. Frowd, F. Rahimi","doi":"10.1109/PICA.1995.515177","DOIUrl":null,"url":null,"abstract":"This paper describes the short-term resource scheduling (STRS) function that has been developed by Siemens-Empros as part of the new SBB/Direktion Kraftwerk (Swiss Rail) energy management system. Optimal scheduling of the single-phase hydroelectric power plants, single-phase and three-phase energy accounts, and purchase and sale of three phase energy subject to a multitude of physical and contractual constraints (including spinning and regulating reserve requirements), is the main objective of the STRS function. The operations planning horizon of STRS is one day to one week using an hourly time increment.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"26","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Power Industry Computer Applications Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1995.515177","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 26

Abstract

This paper describes the short-term resource scheduling (STRS) function that has been developed by Siemens-Empros as part of the new SBB/Direktion Kraftwerk (Swiss Rail) energy management system. Optimal scheduling of the single-phase hydroelectric power plants, single-phase and three-phase energy accounts, and purchase and sale of three phase energy subject to a multitude of physical and contractual constraints (including spinning and regulating reserve requirements), is the main objective of the STRS function. The operations planning horizon of STRS is one day to one week using an hourly time increment.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
瑞士铁路短期水力发电和立交合同调度
本文介绍了Siemens-Empros开发的短期资源调度(STRS)功能,该功能是新的SBB/ direction Kraftwerk(瑞士铁路)能源管理系统的一部分。STRS功能的主要目标是对单相水电站、单相和三相能源账户以及受多种物理和合同约束(包括旋转和调节储备要求)的三相能源的购买和销售进行优化调度。STRS的操作计划范围是一天到一周,使用小时时间增量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Development of the Intercontrol Center Communications Protocol (ICCP) [power system control] Hydropower generation management under uncertainty via scenario analysis and parallel computation Optimal fuzzy inference for short-term load forecasting Long-term/mid-term resource optimization of a hydro-dominant power system using interior point method The design of next generation SCADA systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1