{"title":"Natech Risk Assessment and Control Through Innovative Risk Reduction Measures – Pipeline / Landslide Interaction Case","authors":"J. Aristizabal, D. Moncada","doi":"10.1115/ipg2021-65010","DOIUrl":null,"url":null,"abstract":"\n At the end of 2018, a large-scale landslide was identified near the Right of Way of one of the pipelines operated by Cenit Transporte y Logística de Hidrocarburos. In this zone it was possible to identify a populated area and a river. At the beginning the depth of the Landslide did not represent a hazard to the pipeline due to the Horizontal Directional Drilling technique applied when the pipeline was built. A monitoring program was developed through inclinometers and piezometers and In-Line Inspections were carried out to identify any disturbance in the alignment of the pipeline.\n From the monitoring program and In-Line Inspection data it was possible to confirm interaction between the landslide and the pipeline. A perpendicular force to the pipeline alignment produces a bending strain at two points, and landslide interact with the pipeline along a length of 170 m. The depth of the landslide failure surface was in between 17 to 22 m, and the pipeline was about 15 m deep.\n Due to this interaction, it was necessary to develop a risk assessment to identify a safe limit displacement. For a while, this allowed us to design both a temporal innovative solution considering a flexible pipeline and a definitive solution to build the new segment of the pipeline which was deeper than the last one, through the Horizontal Directional Drilling technique.","PeriodicalId":138244,"journal":{"name":"ASME-ARPEL 2021 International Pipeline Geotechnical Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASME-ARPEL 2021 International Pipeline Geotechnical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/ipg2021-65010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
At the end of 2018, a large-scale landslide was identified near the Right of Way of one of the pipelines operated by Cenit Transporte y Logística de Hidrocarburos. In this zone it was possible to identify a populated area and a river. At the beginning the depth of the Landslide did not represent a hazard to the pipeline due to the Horizontal Directional Drilling technique applied when the pipeline was built. A monitoring program was developed through inclinometers and piezometers and In-Line Inspections were carried out to identify any disturbance in the alignment of the pipeline.
From the monitoring program and In-Line Inspection data it was possible to confirm interaction between the landslide and the pipeline. A perpendicular force to the pipeline alignment produces a bending strain at two points, and landslide interact with the pipeline along a length of 170 m. The depth of the landslide failure surface was in between 17 to 22 m, and the pipeline was about 15 m deep.
Due to this interaction, it was necessary to develop a risk assessment to identify a safe limit displacement. For a while, this allowed us to design both a temporal innovative solution considering a flexible pipeline and a definitive solution to build the new segment of the pipeline which was deeper than the last one, through the Horizontal Directional Drilling technique.