DESAIN CHANGES IN A SHORT DURATION CONSTRUCTION PROJECT WITH COST AND TIME BOUNDARIES: A PROJECT REVIEW

Rachmad Irwanto
{"title":"DESAIN CHANGES IN A SHORT DURATION CONSTRUCTION PROJECT WITH COST AND TIME BOUNDARIES: A PROJECT REVIEW","authors":"Rachmad Irwanto","doi":"10.24853/ijcei.2.2.19-27","DOIUrl":null,"url":null,"abstract":"Design changes are inevitable in most projects. In many construction projects they may look not too complicated to be executed in front of computer models. The actual situation turned out to be the other way around. Apart from detailed changes in shop drawings, bill of quantity and specifications, administrative works related to the project are quite considerations. These mounted consequences would be more for short duration projects with government funding executed in the near end book period. The allocated execution period for short duration projects is not usually allowing rapid changes for the unexpected consequences. This paper presents what actually happens inside the project management during the contract change order process.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Civil Engineering and Infrastructure","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24853/ijcei.2.2.19-27","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Design changes are inevitable in most projects. In many construction projects they may look not too complicated to be executed in front of computer models. The actual situation turned out to be the other way around. Apart from detailed changes in shop drawings, bill of quantity and specifications, administrative works related to the project are quite considerations. These mounted consequences would be more for short duration projects with government funding executed in the near end book period. The allocated execution period for short duration projects is not usually allowing rapid changes for the unexpected consequences. This paper presents what actually happens inside the project management during the contract change order process.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在具有成本和时间限制的短期建设项目中设计变更:项目回顾
在大多数项目中,设计变更是不可避免的。在许多建筑项目中,它们可能看起来不太复杂,无法在计算机模型面前执行。实际情况却正好相反。除了施工图、工程量清单和规格的详细更改外,与项目相关的行政工作也非常需要考虑。这些增加的后果将更多地出现在短期项目中,这些项目由政府资助,在接近账面期末执行。为短期项目分配的执行周期通常不允许对意外结果进行快速更改。本文介绍了在合同变更订单过程中项目管理内部实际发生的情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
NUMERICAL MODELLING ON BEHAVIOUR OF COLD-FORMED STEEL UNLIPPED CHANNEL UNDER COMBINED COMPRESSION AND BENDING ACTIONS SIMULATION OF RING CONNECTION MODIFICATION ON FLARE STACK STRUCTURE STUDY ON FREE VIBRATION OF SKEW PLATE USING FINITE ELEMENT METHOD THE TRAVEL TIME PERFOMANCE ANALYSIS OF THE COMMUTER LINE TRAIN (KRL) (CASE STUDY: THE COMMUTER LINE TRAIN BLUE LINE CORRIDOR, BEKASI - JAKARTA KOTA) VALUE STREAM MAPPING FOR WASTE IDENTIFICATION IN THE LOW COST HOUSE CONSTRUCTION PROCESS (CASE STUDY: XYZ HOUSING
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1