Production Stage and Risk Identification on Asphalt Mixing Plant in Bali

A.A.A Made Cahaya Wardani, I. Thanaya, N. Y. Astana, A. Yana
{"title":"Production Stage and Risk Identification on Asphalt Mixing Plant in Bali","authors":"A.A.A Made Cahaya Wardani, I. Thanaya, N. Y. Astana, A. Yana","doi":"10.32535/ijabim.v4i3.678","DOIUrl":null,"url":null,"abstract":"Cost, quality and time are an important performance indicators in the project success. To achieve these objectives various risks are faced in each project life cycle. One of these risks is supply chain risk, which must be managed properly, doe to the uncertainty in this activity. There are still many companies that do not understand the importance of supply chains, so they often become obstacles in achieving project goals This study aims to identify risk factors in each stage of supply chain activities, in road infrastructure in Bali Province. Data were collected from questionnaire survey, interviews and focus group discussion from 15 units asphalt mixing plant supplier in Bali, who understand supply chain issues, especially in road infrastructure work in the province of Bali. The results of research on risk is firstly AMP production processes identified as a field of manufacturing industry that produces hot asphalt used in infrastructure projects in Bali. This research was conducted at the AMP unit found in Bali. From research, the production process and AMP business are based on Supply, Input, Process, Output and Customer activities. (SIPOC). After the activities contained in the Asphalt production process, it is known that further risks can be identified. Second identity the risk on SIPOC process.","PeriodicalId":231128,"journal":{"name":"International Journal of Applied Business and International Management","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Applied Business and International Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32535/ijabim.v4i3.678","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Cost, quality and time are an important performance indicators in the project success. To achieve these objectives various risks are faced in each project life cycle. One of these risks is supply chain risk, which must be managed properly, doe to the uncertainty in this activity. There are still many companies that do not understand the importance of supply chains, so they often become obstacles in achieving project goals This study aims to identify risk factors in each stage of supply chain activities, in road infrastructure in Bali Province. Data were collected from questionnaire survey, interviews and focus group discussion from 15 units asphalt mixing plant supplier in Bali, who understand supply chain issues, especially in road infrastructure work in the province of Bali. The results of research on risk is firstly AMP production processes identified as a field of manufacturing industry that produces hot asphalt used in infrastructure projects in Bali. This research was conducted at the AMP unit found in Bali. From research, the production process and AMP business are based on Supply, Input, Process, Output and Customer activities. (SIPOC). After the activities contained in the Asphalt production process, it is known that further risks can be identified. Second identity the risk on SIPOC process.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
巴厘沥青搅拌站生产阶段及风险识别
成本、质量和时间是项目成功与否的重要绩效指标。为了实现这些目标,在每个项目生命周期中都面临着各种风险。其中一种风险是供应链风险,必须妥善管理,这与该活动的不确定性有关。仍有许多公司不了解供应链的重要性,因此它们往往成为实现项目目标的障碍。本研究旨在确定巴厘岛省道路基础设施中供应链活动各个阶段的风险因素。数据通过问卷调查、访谈和焦点小组讨论收集,这些数据来自巴厘岛的15家沥青搅拌站供应商,他们了解供应链问题,特别是在巴厘岛省的道路基础设施工作中。风险研究的结果首先是AMP生产过程被确定为制造业的一个领域,生产用于巴厘岛基础设施项目的热沥青。这项研究是在巴厘岛发现的AMP单位进行的。从研究来看,生产过程和AMP业务是基于供应、输入、过程、输出和客户活动。(SIPOC)。在沥青生产过程中所包含的活动之后,已知可以确定进一步的风险。第二,识别SIPOC过程中的风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
How Does Governance, Individual Internal Factors and Supervisory Functions Affect the Quality of Savings and Loans Cooperative Financial Reports? Continuity Business of Coffee Shop in Malang City in the Facing of Covid-19 Pandemic Enhancing Competitiveness in Indonesia's Furniture Craft Industry: A Five Porter Analysis Influence of Risk Perception and Destination Image Mediated by Satisfaction Towards Destination Loyalty in Tanjung Lesung Tourism Islamic Leadership: Prophet Muhammad as a Role Model for being Charismatic, Transformational, and Servant Leader
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1