Using simulation to solve facility layout for food industry at XYZ Company

N. Amit, N. Suhadak, N. Johari, I. Kassim
{"title":"Using simulation to solve facility layout for food industry at XYZ Company","authors":"N. Amit, N. Suhadak, N. Johari, I. Kassim","doi":"10.1109/SHUSER.2012.6268900","DOIUrl":null,"url":null,"abstract":"The systematic layout planning (SLP) procedure of designing facilities layout which is widely used by enterprises provides the framework to this study's objective of identifying weaknesses in the production process of XYZ Company, a snack food manufacturing company. The observation and evaluation of the current production process indicate the incidence of bottlenecks, especially at the cooling station which interferes with the production flow. However, the fundamental problem that could inhibit the long-run production flexibility is its suboptimum facilities layout. This leads to high travelling time and high travelling cost. The study found weaknesses from the point of facilities layout flexibility (FLF), productive area utilisation (PAU) and closeness gap (CG). With these weaknesses, it is unlikely that the company would be able to respond both in quantity and quality, as well as to provide working conditions that are conducive to the workers. Two alternative layouts are proposed using the Systematic Layout Planning, which is a systematic way of generating layout alternatives. The proposed layouts are evaluated using the current layout and ARENA simulation software. The best alternative chosen based on the performance measures which have the most significant improvement which are total travel distance, total travel time, total travel cost and output. In line with the factory's future expansion and the company' overall diversification programme, the study also recommends that it embarks on a vertical integration by going into tapioca planting. This would ensure constant supply of raw materials, both in quantity and quality.","PeriodicalId":426671,"journal":{"name":"2012 IEEE Symposium on Humanities, Science and Engineering Research","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE Symposium on Humanities, Science and Engineering Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SHUSER.2012.6268900","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

The systematic layout planning (SLP) procedure of designing facilities layout which is widely used by enterprises provides the framework to this study's objective of identifying weaknesses in the production process of XYZ Company, a snack food manufacturing company. The observation and evaluation of the current production process indicate the incidence of bottlenecks, especially at the cooling station which interferes with the production flow. However, the fundamental problem that could inhibit the long-run production flexibility is its suboptimum facilities layout. This leads to high travelling time and high travelling cost. The study found weaknesses from the point of facilities layout flexibility (FLF), productive area utilisation (PAU) and closeness gap (CG). With these weaknesses, it is unlikely that the company would be able to respond both in quantity and quality, as well as to provide working conditions that are conducive to the workers. Two alternative layouts are proposed using the Systematic Layout Planning, which is a systematic way of generating layout alternatives. The proposed layouts are evaluated using the current layout and ARENA simulation software. The best alternative chosen based on the performance measures which have the most significant improvement which are total travel distance, total travel time, total travel cost and output. In line with the factory's future expansion and the company' overall diversification programme, the study also recommends that it embarks on a vertical integration by going into tapioca planting. This would ensure constant supply of raw materials, both in quantity and quality.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
用仿真方法解决XYZ公司食品工业的设施布局问题
本研究的目标是找出休闲食品制造企业XYZ公司生产过程中的弱点,而广泛应用于企业的设施布局设计系统布局规划(SLP)程序为研究提供了框架。对当前生产过程的观察和评价表明瓶颈的发生率,特别是在冷却站,它干扰了生产流程。然而,制约长期生产灵活性的根本问题是其设施布局的次优性。这导致了高的旅行时间和高的旅行成本。该研究从设施布局灵活性(FLF)、生产面积利用率(PAU)和距离差距(CG)的角度发现了弱点。有了这些弱点,公司不太可能在数量和质量上做出反应,也不太可能提供有利于工人的工作条件。系统布局规划是一种生成备选布局的系统方法,提出了两种备选布局。使用当前布局和ARENA仿真软件对所提出的布局进行了评估。根据总行程距离、总行程时间、总行程成本和总产出这四个性能指标,选择出改进最显著的最佳方案。根据工厂未来的扩张和公司的整体多样化计划,该研究还建议该公司通过木薯种植开始垂直整合。这将确保原材料在数量和质量上的持续供应。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Islamic inheritance claim processes — Non-normality data traits and best estimator choice Treatment effectiveness of continuous passive motion machine during post-operative treatment of anterior cruciate ligament patients Harmonic elimination in switching table-based direct torque control of five-phase PMSM using matrix converter Digital stable IIR high pass filter optimization using PSO-CFIWA IPv6 attack scenarios testbed
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1