{"title":"Improvement on the dry process unit: Matozinhos plant-C.N.C.P.-M.G-Brazil","authors":"F. J. P. Leme, T. Neto","doi":"10.1109/CITCON.1990.111061","DOIUrl":null,"url":null,"abstract":"Various improvements made to the dry process unit of a Brazilian cement plant are discussed. Details are presented for each of the five modification stages. In each case the results are briefly assessed and costs given.<<ETX>>","PeriodicalId":339195,"journal":{"name":"IEEE Technical Conference on cement Industry","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1990-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Technical Conference on cement Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.1990.111061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Various improvements made to the dry process unit of a Brazilian cement plant are discussed. Details are presented for each of the five modification stages. In each case the results are briefly assessed and costs given.<>