RENCANA ANGGARAN BIAYA DAN METODE PELAKSANAAN PADA PROYEK PEMBANGUNAN JALAN AKSES PELABUHAN PERIKANAN LAMPULO STA 0+-000 SID 1+-013 KOTA BANDA ACEH

M. Irfan
{"title":"RENCANA ANGGARAN BIAYA DAN METODE PELAKSANAAN PADA PROYEK PEMBANGUNAN JALAN AKSES PELABUHAN PERIKANAN LAMPULO STA 0+-000 SID 1+-013 KOTA BANDA ACEH","authors":"M. Irfan","doi":"10.30811/portal.v8i2.607","DOIUrl":null,"url":null,"abstract":"Lampulo Fishing Port Road Access Project, Banda Aceh City with 1013 m of road length, 10 m road width, base course layer 15 cm thickness, subcase 20 cm layer, 6 cm surface Aspalt Concrete Binder Course (AC BC) and Talud work . This Final Project aims to determine the method of implementation and budget costs on the project. The calculation of the Budget Plan uses the EI Analysis (Estimated Index) to calculate the cost of Sub Base, Base Course, Prime Coat, Surface Aspalt Concrete Binder Course (AC-BC), and Talud work. In this calculation, the cost for Sub Base work is Rp.1.027.631.772,00, -. Work Base Course Rp.970.243.296, 00, -. Prime coat job Rp.121.358.725,00, -. Surface layer work Aspalt Concrete Binder Course (AC-BC) Rp.1.906.855.195,00, Talud Work Rp.2.639.141.122, 00, -. So the total cost of the budget is Rp.6.695.230.109, 00. As well as scheduling the implementation time using the curve S. The preparation of the Implementation method applied to the Project includes Sub Base, Base Course, Prime Coat and Surace Aspalt Cpncrete Binder Course (AC-BC) work in an effective and efficient manner based on the drawing of the plan.Keywords: Budget Costs, S Curve, and Methods of Accounting.","PeriodicalId":378653,"journal":{"name":"Portal: Jurnal Teknik Sipil","volume":"89 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Portal: Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30811/portal.v8i2.607","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Lampulo Fishing Port Road Access Project, Banda Aceh City with 1013 m of road length, 10 m road width, base course layer 15 cm thickness, subcase 20 cm layer, 6 cm surface Aspalt Concrete Binder Course (AC BC) and Talud work . This Final Project aims to determine the method of implementation and budget costs on the project. The calculation of the Budget Plan uses the EI Analysis (Estimated Index) to calculate the cost of Sub Base, Base Course, Prime Coat, Surface Aspalt Concrete Binder Course (AC-BC), and Talud work. In this calculation, the cost for Sub Base work is Rp.1.027.631.772,00, -. Work Base Course Rp.970.243.296, 00, -. Prime coat job Rp.121.358.725,00, -. Surface layer work Aspalt Concrete Binder Course (AC-BC) Rp.1.906.855.195,00, Talud Work Rp.2.639.141.122, 00, -. So the total cost of the budget is Rp.6.695.230.109, 00. As well as scheduling the implementation time using the curve S. The preparation of the Implementation method applied to the Project includes Sub Base, Base Course, Prime Coat and Surace Aspalt Cpncrete Binder Course (AC-BC) work in an effective and efficient manner based on the drawing of the plan.Keywords: Budget Costs, S Curve, and Methods of Accounting.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
BANDA亚齐港渔业通道建设预算和实施计划的成本和方法
班达亚齐市兰普罗渔港道路通道工程,道路长度1013米,道路宽度10米,基层层厚度15厘米,子层厚度20厘米,表面6厘米的沥青混凝土粘结层(AC BC)和塔卢德工程。这个Final Project旨在确定项目的实施方法和预算成本。预算计划的计算使用EI分析(估计指数)来计算基层、基层、底漆、表面沥青混凝土粘结层(AC-BC)和塔鲁德工程的成本。在此计算中,分基地工程的费用为1.027.631.77.2万卢比。工作基础课程Rp.970.243.296, 000, -。底漆作业编号:121.358.725,000,-。表层工作沥青混凝土粘结剂课程(AC-BC) rp .1.906.855.195,00, Talud工作rp . 2.639.141.122,00, -。所以预算的总成本为6.695.230.10.9万卢比。以及使用曲线s来安排施工时间。本项目所采用的施工方法的编制,包括下层基层、基层、底漆和表面沥青混凝土粘结剂层(AC-BC),根据计划的绘制,以有效和高效的方式工作。关键词:预算成本,S曲线,会计核算方法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Prototype Jembatan Tipe Plate Girder U (PGU) dengan Lantai Orthotropic Komposit Evaluasi Deskriptif Sistem Pembayaran Bus Rapid Transit Estimasi Biaya Proyek pada Kontrakor Skala Kecil di Bali pada Masa Pandemi COVID-19 3 Floor Luxury House Structure Design Planning Using ETABS Software Cover
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1