{"title":"Connecting the dots: distribution grid investments to power the energy transition","authors":"P. Wilczek","doi":"10.1049/icp.2021.2473","DOIUrl":null,"url":null,"abstract":"In early 2021, Eurelectric releases a landmark study on distribution grid investment needs at the EU level by 2030, conducted by Monitor Deloitte in partnership with E.DSO, entitled ‘Connecting the dots’, see also here: https://www.eurelectric.org/connecting-the-dots/","PeriodicalId":186086,"journal":{"name":"11th Solar & Storage Power System Integration Workshop (SIW 2021)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th Solar & Storage Power System Integration Workshop (SIW 2021)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/icp.2021.2473","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16
Abstract
In early 2021, Eurelectric releases a landmark study on distribution grid investment needs at the EU level by 2030, conducted by Monitor Deloitte in partnership with E.DSO, entitled ‘Connecting the dots’, see also here: https://www.eurelectric.org/connecting-the-dots/