Insights From Ivar Aasen Oil Field Project in Norway

{"title":"Insights From Ivar Aasen Oil Field Project in Norway","authors":"","doi":"10.4018/ijpmpa.301237","DOIUrl":null,"url":null,"abstract":"The goal of this chapter is to present lessons learned and insights gained from managing the Ivar Aasen project. Lessons were collected through 28 interviews with key project members and contractors. Findings show that Ivar Aasen was executed under considerable uncertainty regarding the market situation, access to suppliers and was completed under very strict time schedule. The project was complex with over 140 suppliers and subcontractors that were globally distributed. The project was also the first major project for the operator company. Findings shows that the underlying context of the project was a source of several challenges encountered during execution. In spite of these challenges, the project was completed on budget and on schedule and now the field is in full operation. The paper presents a narrative description of the challenges encountered as well as the factors that contributed to project success. Based on insights gained, the paper presents 18 recommendations that should be adhered to succeed with projects that exhibits similar characteristics as Ivar Aasen project.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Project Management and Productivity Assessment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/ijpmpa.301237","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The goal of this chapter is to present lessons learned and insights gained from managing the Ivar Aasen project. Lessons were collected through 28 interviews with key project members and contractors. Findings show that Ivar Aasen was executed under considerable uncertainty regarding the market situation, access to suppliers and was completed under very strict time schedule. The project was complex with over 140 suppliers and subcontractors that were globally distributed. The project was also the first major project for the operator company. Findings shows that the underlying context of the project was a source of several challenges encountered during execution. In spite of these challenges, the project was completed on budget and on schedule and now the field is in full operation. The paper presents a narrative description of the challenges encountered as well as the factors that contributed to project success. Based on insights gained, the paper presents 18 recommendations that should be adhered to succeed with projects that exhibits similar characteristics as Ivar Aasen project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
挪威Ivar Aasen油田项目的启示
本章的目的是介绍从管理Ivar Aasen项目中获得的经验教训和见解。通过对主要项目成员和承包商的28次访谈收集了经验教训。调查结果显示,Ivar Aasen是在市场情况、能否获得供应商等相当不确定的情况下执行的,并且是在非常严格的时间表下完成的。这个项目很复杂,有140多个供应商和分包商分布在全球。该项目也是该运营商公司的第一个重大项目。调查结果表明,项目的潜在背景是在执行过程中遇到的几个挑战的来源。尽管存在这些挑战,但该项目仍按预算和时间表完成,目前该油田已全面投入运营。本文叙述了所遇到的挑战以及促成项目成功的因素。基于所获得的见解,本文提出了18条建议,这些建议应该遵循,以使具有与Ivar Aasen项目相似特征的项目取得成功。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Career Adaptability of Jubail University College Students Estimation of Construction Activity Duration Under Uncertainty Using Discrete Fuzzy Weighted Average Algorithm Performance Management System Implementation Challenges in State-Owned Enterprises A COMPARATIVE ANALYSIS OF PERFORMANCE OF DOMESTIC AND FOREIGN CONTRACTORS THE CASE OF ETHIOPIAN FEDERAL ROAD CONSTRUCTION PROJECTS Turnaround Strategy Implementation for Services Efficacy and Citizenry Satisfaction in Government Organizations
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1