首页 > 最新文献

International Journal of Project Management and Productivity Assessment最新文献

英文 中文
Turnaround Strategy Implementation for Services Efficacy and Citizenry Satisfaction in Government Organizations 政府机构服务效能与市民满意度之转型策略实施
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.297085
The Government Enterprise (GE) implemented a turnaround strategy to enhance service efficacy and citizenry satisfaction in 2014. However, this GE takes too long like three months to issue any key documents such as birth, death, marriage certificates, passports, and work permits today. This reflects that the efficacy of services and the satisfaction of citizens is questionable. Hence, the main objective of the research was to investigate the turnaround strategy implementation in GE. Adopting the qualitative descriptive research design, questionnaires administered to the management and staff members, and interviews conducted with clients, thematic analysis has been undertaken. Findings reveal that the turnaround strategy did improve service efficacy and citizenry satisfaction for some time but there was a relapse. Recommendations include the adoption of customer service strategies along with the revival of the turnaround strategy and top management new team who can introduce with fresh ideas, staff training with constant monitoring, and control measures.
政府企业在2014年推行转型策略,以提升服务效能和市民满意度。但是,今天的通用电气需要三个月的时间才能签发出生、死亡、结婚证书、护照、工作许可等关键文件。这反映了服务的效力和公民的满意度是值得怀疑的。因此,本研究的主要目的是调查通用电气公司的周转战略实施情况。采用定性描述性研究设计,向管理人员和工作人员发放问卷,并与客户进行面谈,进行了专题分析。调查结果显示,转型策略在一段时间内确实改善了服务效能和市民满意度,但有复发。建议包括采用客户服务策略,同时恢复周转策略,高层管理团队可以引入新的想法,员工培训,持续监控和控制措施。
{"title":"Turnaround Strategy Implementation for Services Efficacy and Citizenry Satisfaction in Government Organizations","authors":"","doi":"10.4018/ijpmpa.297085","DOIUrl":"https://doi.org/10.4018/ijpmpa.297085","url":null,"abstract":"The Government Enterprise (GE) implemented a turnaround strategy to enhance service efficacy and citizenry satisfaction in 2014. However, this GE takes too long like three months to issue any key documents such as birth, death, marriage certificates, passports, and work permits today. This reflects that the efficacy of services and the satisfaction of citizens is questionable. Hence, the main objective of the research was to investigate the turnaround strategy implementation in GE. Adopting the qualitative descriptive research design, questionnaires administered to the management and staff members, and interviews conducted with clients, thematic analysis has been undertaken. Findings reveal that the turnaround strategy did improve service efficacy and citizenry satisfaction for some time but there was a relapse. Recommendations include the adoption of customer service strategies along with the revival of the turnaround strategy and top management new team who can introduce with fresh ideas, staff training with constant monitoring, and control measures.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"46 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121342879","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Measuring Efficiency of Bangladeshi Leasing Firms and Exploring Its Relationship With Profitability 孟加拉租赁企业效率测度及其与盈利能力关系探讨
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.301238
The objective of the study was to measure the efficiency of Bangladeshi leasing firms through DEA and relate efficiency with profitability. Twenty-two leasing companies were selected according to simple random sampling method. Average aggregate productivity of firms over the period was only 24.17%. Average input and output technical efficiencies were 81.2% and 91.1% respectively. By changing the scale of operation, firms can increase their efficiency level by 20.43% to reach maximum productive scale size. The problem of firms lie in scale and mix efficiencies which implies that firms are yet to achieve economies of scale and scope. The firms are not producing or generating their outputs at appropriate proportions and are weak in innovation & proliferation of new services. Return on asset is significantly associated with scale efficiency EPS is significantly related to most efficiency measures. In most of the cases profitability indicators are weakly positively related with efficiency measures.
本研究的目的是通过DEA来衡量孟加拉国租赁公司的效率,并将效率与盈利能力联系起来。采用简单随机抽样的方法,选取22家租赁公司。在此期间,企业的平均总生产率仅为24.17%。平均投入和产出技术效率分别为81.2%和91.1%。通过改变经营规模,企业效率水平可提高20.43%,达到最大生产规模。企业的问题在于规模和混合效率,这意味着企业尚未实现规模经济和范围经济。这些公司没有以适当的比例生产或产生产出,在创新和新服务的扩散方面也很弱。资产收益率与规模效率显著相关。每股收益与大多数效率指标显著相关。在大多数情况下,盈利能力指标与效率措施呈弱正相关。
{"title":"Measuring Efficiency of Bangladeshi Leasing Firms and Exploring Its Relationship With Profitability","authors":"","doi":"10.4018/ijpmpa.301238","DOIUrl":"https://doi.org/10.4018/ijpmpa.301238","url":null,"abstract":"The objective of the study was to measure the efficiency of Bangladeshi leasing firms through DEA and relate efficiency with profitability. Twenty-two leasing companies were selected according to simple random sampling method. Average aggregate productivity of firms over the period was only 24.17%. Average input and output technical efficiencies were 81.2% and 91.1% respectively. By changing the scale of operation, firms can increase their efficiency level by 20.43% to reach maximum productive scale size. The problem of firms lie in scale and mix efficiencies which implies that firms are yet to achieve economies of scale and scope. The firms are not producing or generating their outputs at appropriate proportions and are weak in innovation & proliferation of new services. Return on asset is significantly associated with scale efficiency EPS is significantly related to most efficiency measures. In most of the cases profitability indicators are weakly positively related with efficiency measures.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"42 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127468083","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Assessment of Road Maintenance Project Management in Ethiopia The case of Addis Ababa city Administration 埃塞俄比亚道路养护项目管理评价——以亚的斯亚贝巴市政府为例
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.301596
Addis Ababa City Roads Authority manages and implements the construction and maintenance of roads within the city. Different literature support efficient performance of road infrastructure projects is essential for economic growth and development of the country, and data indicate that there is a high range of new construction of road coverage in Addis Ababa. Despite the growth of new road construction there is decline of road maintenance projects and there are different reasons mentioned as factors that affect road maintenance project management performance. Thus, the aim of this study was to assess approaches to improve road maintenance projects management practice by tackling the challenges for future practices. The results indicated that, even though inadequate funding has higher factor that influence the performance of road maintenance project management, there are other factors such as no privatization of road maintenance work and lot of paper work had significant effects on the performance of road maintenance project management practice.
亚的斯亚贝巴市道路管理局管理和实施城市内道路的建设和维护。不同的文献支持道路基础设施项目的高效绩效对国家的经济增长和发展至关重要,数据表明,亚的斯亚贝巴的新建设道路覆盖率很高。在新道路建设增长的同时,道路养护项目却在减少,影响道路养护项目管理绩效的因素有不同的原因。因此,本研究的目的是通过应对未来实践的挑战来评估改善道路养护项目管理实践的方法。结果表明,尽管资金不足是影响道路养护项目管理绩效的较高因素,但道路养护工作未私有化和大量文书工作等其他因素对道路养护项目管理绩效的影响也很大。
{"title":"Assessment of Road Maintenance Project Management in Ethiopia The case of Addis Ababa city Administration","authors":"","doi":"10.4018/ijpmpa.301596","DOIUrl":"https://doi.org/10.4018/ijpmpa.301596","url":null,"abstract":"Addis Ababa City Roads Authority manages and implements the construction and maintenance of roads within the city. Different literature support efficient performance of road infrastructure projects is essential for economic growth and development of the country, and data indicate that there is a high range of new construction of road coverage in Addis Ababa. Despite the growth of new road construction there is decline of road maintenance projects and there are different reasons mentioned as factors that affect road maintenance project management performance. Thus, the aim of this study was to assess approaches to improve road maintenance projects management practice by tackling the challenges for future practices. The results indicated that, even though inadequate funding has higher factor that influence the performance of road maintenance project management, there are other factors such as no privatization of road maintenance work and lot of paper work had significant effects on the performance of road maintenance project management practice.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"23 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125418064","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Estimation of Construction Activity Duration Under Uncertainty Using Discrete Fuzzy Weighted Average Algorithm 基于离散模糊加权平均算法的不确定施工工期估计
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.301598
This paper presents a qualitative risk assessment tool based on fuzzy set theory to estimate the amount of activity duration overrun under the combinatory effect of multiple risk factors. Applying proposed methodology, a set of duration modifiers to calculate the optimistic, most-likely and pessimistic duration values under uncertainty are calculated. To elaborate the methodology, a simulated bridge project with ten risk factors affecting activities duration is presented. Proposed model contributes to knowledge that could help minimize the schedule overrun and improve risk mitigation strategies through providing risk-based duration estimates instead of discrete values. Advantages of the developed approach compared to existing models include (1) considering the combinatory effect of multiple risk factors on activity duration, (2) accounting for uncertainty in experts’ evaluations by employing the interval-valued fuzzy numbers, and (3) utilizing a discrete fuzzy weighted average algorithm which avoids creation of incorrect fuzzy membership functions.
本文提出了一种基于模糊集理论的定性风险评估工具,用于评估多种风险因素组合作用下的作业工期超限量。应用所提出的方法,计算了不确定条件下的乐观、最可能和悲观持续时间值。为了详细说明方法,给出了一个具有十个影响活动持续时间的风险因素的模拟桥梁工程。所提议的模型有助于提供知识,通过提供基于风险的工期估计而不是离散值,有助于最大限度地减少进度超支并改进风险缓解策略。与现有模型相比,所开发的方法的优点包括:(1)考虑了多个风险因素对活动持续时间的组合影响;(2)利用区间值模糊数来考虑专家评估中的不确定性;(3)利用离散模糊加权平均算法避免了不正确的模糊隶属函数的产生。
{"title":"Estimation of Construction Activity Duration Under Uncertainty Using Discrete Fuzzy Weighted Average Algorithm","authors":"","doi":"10.4018/ijpmpa.301598","DOIUrl":"https://doi.org/10.4018/ijpmpa.301598","url":null,"abstract":"This paper presents a qualitative risk assessment tool based on fuzzy set theory to estimate the amount of activity duration overrun under the combinatory effect of multiple risk factors. Applying proposed methodology, a set of duration modifiers to calculate the optimistic, most-likely and pessimistic duration values under uncertainty are calculated. To elaborate the methodology, a simulated bridge project with ten risk factors affecting activities duration is presented. Proposed model contributes to knowledge that could help minimize the schedule overrun and improve risk mitigation strategies through providing risk-based duration estimates instead of discrete values. Advantages of the developed approach compared to existing models include (1) considering the combinatory effect of multiple risk factors on activity duration, (2) accounting for uncertainty in experts’ evaluations by employing the interval-valued fuzzy numbers, and (3) utilizing a discrete fuzzy weighted average algorithm which avoids creation of incorrect fuzzy membership functions.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"57 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114648925","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Union's Knowledge Strategies to Reach Success in the Implementation of Remote Operating Centers (COR) 欧盟成功实施远程操作中心(COR)的知识战略
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.301235
Leonardo Lavanderos, Ramón Morales, Marcelo Bucarey
Current conditions in metal mining, increasing operating costs, lower ore grades, and deeper deposits, make it necessary to take technological breaks to allow for high operating and production efficiencies. In Chile, there are integrated operations centers at the project level. The implementation of state-of-the-art technology has encountered problems such as the lack of a business perspective co-constructed in a political-technical system that breaks with the rigidity of the usual criteria and practices. The resistance to the redistribution of power so as not to perceive these centers as an operational anomaly to overcome the preference to operate manually is generating doubt of their real contribution of value. A transformation cannot be imposed but must be co-created. The knowledge of the trade union networks opens to the company culture possibilities of action that, in the face of a paradigmatic change, emerge to constitute value. This work shows the knowledge strategies to turn unions into cognitive assets to achieve success in the implementation of COR.
在金属开采的当前条件下,不断增加的运营成本、较低的矿石品位和更深的矿床,使得有必要进行技术中断,以实现更高的运营和生产效率。在智利,有项目层面的综合运营中心。最先进技术的实施遇到了一些问题,例如缺乏在政治-技术系统中共同构建的商业观点,该系统打破了通常标准和做法的僵化。为了不把这些中心看作是克服人工操作偏好的操作异常,而对权力重新分配的抵制正在产生对其真正价值贡献的怀疑。转型不能强加,必须共同创造。工会网络的知识向公司文化打开了行动的可能性,在面对范式变化时,出现了构成价值的可能性。本工作展示了将联合转化为认知资产的知识策略,从而在实施COR中取得成功。
{"title":"The Union's Knowledge Strategies to Reach Success in the Implementation of Remote Operating Centers (COR)","authors":"Leonardo Lavanderos, Ramón Morales, Marcelo Bucarey","doi":"10.4018/ijpmpa.301235","DOIUrl":"https://doi.org/10.4018/ijpmpa.301235","url":null,"abstract":"Current conditions in metal mining, increasing operating costs, lower ore grades, and deeper deposits, make it necessary to take technological breaks to allow for high operating and production efficiencies. In Chile, there are integrated operations centers at the project level. The implementation of state-of-the-art technology has encountered problems such as the lack of a business perspective co-constructed in a political-technical system that breaks with the rigidity of the usual criteria and practices. The resistance to the redistribution of power so as not to perceive these centers as an operational anomaly to overcome the preference to operate manually is generating doubt of their real contribution of value. A transformation cannot be imposed but must be co-created. The knowledge of the trade union networks opens to the company culture possibilities of action that, in the face of a paradigmatic change, emerge to constitute value. This work shows the knowledge strategies to turn unions into cognitive assets to achieve success in the implementation of COR.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"37 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121972369","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The X-Matrix as an Integrating Element Between Definition and Strategic Implementation x矩阵作为定义与战略实施之间的整合要素
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.301234
This work explores new dimensions of corporate strategy with a clear focus on strategic alignment and project definition. Project portfolio management offers processes, tools, and knowledge that help the global alignment of different organizational levels with business. In terms of project portfolio management, the causes of failure can be quite diverse. The development of a tool, namely, the X-matrix can help organizations to define and structure strategic objectives, projects, metrics, and those responsible. This work intends to understand the benefits of applying the X-matrix, both in terms of strategic planning and in project portfolio management. The case study carried out at “Company Q" confirms its applicability from the planning to the implementation of the strategy.
这项工作探索了企业战略的新维度,明确关注战略对齐和项目定义。项目组合管理提供了过程、工具和知识,帮助不同的组织级别与业务进行全局统一。就项目组合管理而言,失败的原因可能是多种多样的。开发一种工具,即x矩阵,可以帮助组织定义和构建战略目标、项目、度量标准和责任人。这项工作旨在了解在战略计划和项目组合管理方面应用x矩阵的好处。在“Q公司”进行的案例研究证实了该策略从规划到实施的适用性。
{"title":"The X-Matrix as an Integrating Element Between Definition and Strategic Implementation","authors":"","doi":"10.4018/ijpmpa.301234","DOIUrl":"https://doi.org/10.4018/ijpmpa.301234","url":null,"abstract":"This work explores new dimensions of corporate strategy with a clear focus on strategic alignment and project definition. Project portfolio management offers processes, tools, and knowledge that help the global alignment of different organizational levels with business. In terms of project portfolio management, the causes of failure can be quite diverse. The development of a tool, namely, the X-matrix can help organizations to define and structure strategic objectives, projects, metrics, and those responsible. This work intends to understand the benefits of applying the X-matrix, both in terms of strategic planning and in project portfolio management. The case study carried out at “Company Q\" confirms its applicability from the planning to the implementation of the strategy.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129140269","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Supply chain management in Indonesia, a literature review 印尼供应链管理,文献综述
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.291696
Supply chain management is very critical for organizations and national economic development. Researchers and practitioners need to assess where nations are in terms of their supply chain management maturity level by identifying gaps in both practices and research. This paper aims to analyze the supply chain body of knowledge in the Indonesian context to contribute to the collection of knowledge of supply chain management in Indonesia. A structured content analysis was used to assess research papers published in English and Indonesian in peer-reviewed and accredited journals. The results proved the lack of research in the Supply chain management area within the Indonesian context. Future research guidelines were also presented as a result of this study.
供应链管理对企业和国家经济发展至关重要。研究人员和从业人员需要通过确定实践和研究中的差距来评估各国在供应链管理成熟度方面的水平。本文旨在分析印尼背景下的供应链知识体系,为印尼供应链管理知识的收集做出贡献。一项结构化的内容分析被用于评估以英语和印尼语发表在同行评议和认可期刊上的研究论文。研究结果证明了印尼供应链管理领域研究的不足。作为本研究的结果,也提出了未来的研究指南。
{"title":"Supply chain management in Indonesia, a literature review","authors":"","doi":"10.4018/ijpmpa.291696","DOIUrl":"https://doi.org/10.4018/ijpmpa.291696","url":null,"abstract":"Supply chain management is very critical for organizations and national economic development. Researchers and practitioners need to assess where nations are in terms of their supply chain management maturity level by identifying gaps in both practices and research. This paper aims to analyze the supply chain body of knowledge in the Indonesian context to contribute to the collection of knowledge of supply chain management in Indonesia. A structured content analysis was used to assess research papers published in English and Indonesian in peer-reviewed and accredited journals. The results proved the lack of research in the Supply chain management area within the Indonesian context. Future research guidelines were also presented as a result of this study.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128048349","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ORGANIZATIONAL WARPING IN THE TRANSITION AND INTERACTION PROCESS BETWEEN OPEN PIT AND UNDERGROUND MINING. THE SOMMELIER MODEL 露天与地下开采过渡与相互作用过程中的组织翘曲。侍酒师模式
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.297119
Codelco Chile will revolutionize underground mining as we know it today. The large infrastructure developed should be automated and monitored according to the most recent advances in the field. It implies a systemic conception of the operation to allow the remote control of communications and connectivity of the organization, making possible its coordination, cohesion, and management. The foregoing requires the implementation of an integrated technological model, which includes semi-autonomous operations from an integrated operations and control centre, but for this to happen, the entire organization needs to be adjusted. We propose a systemic model based on the control of the Organizational Waste (Variety No Required VNR). To reduce the loss of value (waste) need to evaluate and correct the incoherence in the decision-making processes, break in the continuity of the information flows by poorly designed organizational structures and by the elevated risk in redundancy values because of the disconnection between these.
智利Codelco公司将彻底改变我们今天所知道的地下采矿。开发的大型基础设施应根据该领域的最新进展实现自动化和监控。它意味着一个系统的操作概念,允许远程控制组织的通信和连接,使其协调、凝聚和管理成为可能。上述情况要求实施集成技术模型,其中包括来自集成操作和控制中心的半自主操作,但要实现这一目标,整个组织需要进行调整。我们提出了一个基于组织浪费控制的系统模型(品种不需要VNR)。为了减少价值损失(浪费),需要评估和纠正决策过程中的不连贯,通过设计不良的组织结构打破信息流的连续性,并由于这些结构之间的脱节而增加冗余值的风险。
{"title":"ORGANIZATIONAL WARPING IN THE TRANSITION AND INTERACTION PROCESS BETWEEN OPEN PIT AND UNDERGROUND MINING. THE SOMMELIER MODEL","authors":"","doi":"10.4018/ijpmpa.297119","DOIUrl":"https://doi.org/10.4018/ijpmpa.297119","url":null,"abstract":"Codelco Chile will revolutionize underground mining as we know it today. The large infrastructure developed should be automated and monitored according to the most recent advances in the field. It implies a systemic conception of the operation to allow the remote control of communications and connectivity of the organization, making possible its coordination, cohesion, and management. The foregoing requires the implementation of an integrated technological model, which includes semi-autonomous operations from an integrated operations and control centre, but for this to happen, the entire organization needs to be adjusted. We propose a systemic model based on the control of the Organizational Waste (Variety No Required VNR). To reduce the loss of value (waste) need to evaluate and correct the incoherence in the decision-making processes, break in the continuity of the information flows by poorly designed organizational structures and by the elevated risk in redundancy values because of the disconnection between these.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127132802","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Application of Factors and Moderation Analysis on Enterprise Resource Planning System Usage in the Middle East 中东地区企业资源计划系统使用的因素与调节分析
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.306974
Mahdi Alzoubi, D. Snider
Organizations make substantial investments in implementing enterprise resource planning (ERP) systems to improve the efficiency and utilization of ERP systems. This study examined the factors influencing and moderating the use of ERP systems. The research variables' hypothetical relationships and moderation analysis were examined through factor analysis and partial least squares structural equation modeling. This study suggests that specific factors significantly influence and moderate the employees' system use. The research results could serve as a reference for vendors when planning the implementation of an ERP system.
组织在实施企业资源规划(ERP)系统方面进行了大量投资,以提高ERP系统的效率和利用率。本研究探讨了影响和调节ERP系统使用的因素。通过因子分析和偏最小二乘结构方程模型检验研究变量的假设关系和调节分析。本研究表明,特定因素显著影响和调节员工的系统使用。研究结果可为供应商规划实施ERP系统提供参考。
{"title":"Application of Factors and Moderation Analysis on Enterprise Resource Planning System Usage in the Middle East","authors":"Mahdi Alzoubi, D. Snider","doi":"10.4018/ijpmpa.306974","DOIUrl":"https://doi.org/10.4018/ijpmpa.306974","url":null,"abstract":"Organizations make substantial investments in implementing enterprise resource planning (ERP) systems to improve the efficiency and utilization of ERP systems. This study examined the factors influencing and moderating the use of ERP systems. The research variables' hypothetical relationships and moderation analysis were examined through factor analysis and partial least squares structural equation modeling. This study suggests that specific factors significantly influence and moderate the employees' system use. The research results could serve as a reference for vendors when planning the implementation of an ERP system.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"64 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130211111","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Kilden Performing Arts Centre 基尔登表演艺术中心
Pub Date : 2022-01-01 DOI: 10.4018/ijpmpa.2022010103
O. J. Klakegg
Most texts on project governance and project management portrays the organization as populated by anonymous people in abstract roles like ‘project manager’, ‘sponsor’, ‘team member’. This paper takes the contrasting position that the project organization is developed by individuals with a specter of competences, strong and weak sides and relations to other people and organizations. The storyline presents a case study from a real-life project developing a new culture institution in Norway over a period of 10 years. Data was gathered ex-post by two researchers through interviews and document studies. The paper first defines key concepts and then presents an analytical framework for the purpose of analyzing the roles in this case story. It gives new insight to the roles as project manager and project executive. The story illustrates the importance of continuity and persistence in the role as project executive. These issues are relevant in future projects given the growing size and complexity seen in projects and the focus on stakeholder value that is prominent in project literature.
大多数关于项目治理和项目管理的文本都将组织描绘成由扮演抽象角色的匿名人员组成的,比如“项目经理”、“发起人”、“团队成员”。本文认为项目组织是由具有能力幽灵、强弱面幽灵以及与他人和组织的关系幽灵的个人发展起来的。故事情节呈现了一个现实生活中的案例研究,该项目在10年的时间里在挪威发展了一个新的文化机构。数据由两位研究者通过访谈和文献研究收集。本文首先定义了关键概念,然后提出了一个分析框架,目的是分析这个案例故事中的角色。它为项目经理和项目执行人员的角色提供了新的见解。这个故事说明了作为项目执行人员,连续性和持久性的重要性。这些问题在未来的项目中是相关的,因为项目的规模和复杂性越来越大,项目文献中对利益相关者价值的关注也越来越突出。
{"title":"Kilden Performing Arts Centre","authors":"O. J. Klakegg","doi":"10.4018/ijpmpa.2022010103","DOIUrl":"https://doi.org/10.4018/ijpmpa.2022010103","url":null,"abstract":"Most texts on project governance and project management portrays the organization as populated by anonymous people in abstract roles like ‘project manager’, ‘sponsor’, ‘team member’. This paper takes the contrasting position that the project organization is developed by individuals with a specter of competences, strong and weak sides and relations to other people and organizations. The storyline presents a case study from a real-life project developing a new culture institution in Norway over a period of 10 years. Data was gathered ex-post by two researchers through interviews and document studies. The paper first defines key concepts and then presents an analytical framework for the purpose of analyzing the roles in this case story. It gives new insight to the roles as project manager and project executive. The story illustrates the importance of continuity and persistence in the role as project executive. These issues are relevant in future projects given the growing size and complexity seen in projects and the focus on stakeholder value that is prominent in project literature.","PeriodicalId":247559,"journal":{"name":"International Journal of Project Management and Productivity Assessment","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126404207","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
International Journal of Project Management and Productivity Assessment
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1