DC Power Plant Monitor Configuration and Acceptance Testing

T.B. Bailey
{"title":"DC Power Plant Monitor Configuration and Acceptance Testing","authors":"T.B. Bailey","doi":"10.1109/INTLEC.2006.251594","DOIUrl":null,"url":null,"abstract":"The issue to be discussed in this paper is how to configure the monitoring system in a DC power plant to deliver what is most beneficial to the user. As monitoring systems get more complex and offer more functionality, there is often confusion within the user community about what is necessary and useful. All too often these sophisticated systems are not used to a fraction of their capabilities. The thrust of this paper is to explore the various features of modern monitoring systems and the benefits they offer to the user. Today, DC power plants are often installed by third party installation vendors. When there are no specifics given in the scope of work, the installation vendor does precisely what he was contracted to do, install the monitor, not configure it. This paper will conclude with suggestions on how to define specific configuration parameters to be included in the scope of work","PeriodicalId":356699,"journal":{"name":"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference","volume":"121 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTELEC 06 - Twenty-Eighth International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.2006.251594","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The issue to be discussed in this paper is how to configure the monitoring system in a DC power plant to deliver what is most beneficial to the user. As monitoring systems get more complex and offer more functionality, there is often confusion within the user community about what is necessary and useful. All too often these sophisticated systems are not used to a fraction of their capabilities. The thrust of this paper is to explore the various features of modern monitoring systems and the benefits they offer to the user. Today, DC power plants are often installed by third party installation vendors. When there are no specifics given in the scope of work, the installation vendor does precisely what he was contracted to do, install the monitor, not configure it. This paper will conclude with suggestions on how to define specific configuration parameters to be included in the scope of work
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
直流电厂监控器配置及验收试验
本文讨论的问题是如何配置直流发电厂的监控系统,以提供最有利于用户的服务。随着监控系统变得越来越复杂,提供的功能也越来越多,用户群体经常会对哪些是必要的和有用的感到困惑。通常情况下,这些复杂的系统不习惯它们的一小部分功能。本文的主旨是探讨现代监控系统的各种特点及其为用户提供的好处。今天,直流发电厂通常由第三方安装供应商安装。当工作范围中没有给出详细说明时,安装供应商将准确地按照合同要求进行操作,安装监视器,而不是配置它。本文最后将给出关于如何定义工作范围中包含的特定配置参数的建议
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Active Clamp Converter with Full Resonant Switching Float Life Expectancy of VRLA-Batteries Based on High Temperature Float Tests Impact of Discharge Rate, Design and Test Parameter Extended Run Fuel Cell Backup Power: Solving the Hydrogen Problem Ground Fault Detection by Differential Monitoring of the Float Current Different Frequency Instabilities of Averaged Current Controlled Boost PFC AC-DC Regulators
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1