Cost Evolution Throughout the Construction Value Chain

Zakaria Dakhli, Z. Lafhaj
{"title":"Cost Evolution Throughout the Construction Value Chain","authors":"Zakaria Dakhli, Z. Lafhaj","doi":"10.29173/MOCS74","DOIUrl":null,"url":null,"abstract":"This study is based on the following observation: there is a significant difference between the initial budget forecast and the final budget of construction project. Cost differences in construction projects between the first estimate made by the engagement committee and the actual construction cost at the end of the project are highlighted. Our study therefore focuses on indicators that track the overall cost of a construction project from the client's perspective, in this case the real estate development company. The objectives are as follow: Highlight cost variances in construction projects and analyze the gaps between the initial cost design by customer and final construction. The waste between the \"design\", “marketing” and \"construction\" phases is discussed. The paper also quantifies waste in terms of cost between the phases. The analysis reveal that the overall cost evolution is 2.59%, with 0.89% coming from the Construction phase and 1.72% from the Marketing phase, and 0.09% from the Design phase. The results could be of interest to a wide range of researchers working on the interface between the design and construction phases.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modular and Offsite Construction (MOC) Summit Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29173/MOCS74","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study is based on the following observation: there is a significant difference between the initial budget forecast and the final budget of construction project. Cost differences in construction projects between the first estimate made by the engagement committee and the actual construction cost at the end of the project are highlighted. Our study therefore focuses on indicators that track the overall cost of a construction project from the client's perspective, in this case the real estate development company. The objectives are as follow: Highlight cost variances in construction projects and analyze the gaps between the initial cost design by customer and final construction. The waste between the "design", “marketing” and "construction" phases is discussed. The paper also quantifies waste in terms of cost between the phases. The analysis reveal that the overall cost evolution is 2.59%, with 0.89% coming from the Construction phase and 1.72% from the Marketing phase, and 0.09% from the Design phase. The results could be of interest to a wide range of researchers working on the interface between the design and construction phases.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
整个建筑价值链的成本演变
本研究基于以下观察:建设项目的初始预算预测与最终预算之间存在显著差异。在工程项目中,审计委员会的首次估算与项目结束时的实际工程成本之间的成本差异是突出的。因此,我们的研究侧重于从客户的角度跟踪建筑项目总成本的指标,在本例中是房地产开发公司。目标如下:突出建筑项目中的成本差异,分析客户初始成本设计与最终施工之间的差距。讨论了“设计”、“营销”和“施工”阶段之间的浪费。本文还根据各个阶段之间的成本对浪费进行了量化。分析表明,总成本演变为2.59%,其中0.89%来自建设阶段,1.72%来自营销阶段,0.09%来自设计阶段。这些结果可能会引起许多研究设计和施工阶段之间界面的研究人员的兴趣。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
VDC management in the industrialization process using prefabricated reinforcement cages. Case Study: Ovalo Monitor Bridge Keyword identification framework for speech communication on construction sites Offsite Construction education adoption in Civil Engineering undergraduate curriculum: analysis and proposal Layout modelling of the built environment for autonomous mobile robots using Building Information Modelling (BIM) and simulation An holistic approach to product evaluation and selection in industrialised building: Benchmarking of long span, low carbon floor systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1