An Investigation on the Factors That Influence the Performance of Construction Projects

Padmasree S., Niji T. N
{"title":"An Investigation on the Factors That Influence the Performance of Construction Projects","authors":"Padmasree S., Niji T. N","doi":"10.59544/kzon5523/ngcesi23p132","DOIUrl":null,"url":null,"abstract":"Construction industry is considered as one of the most important and second largest industries in India after agriculture. It is well known that most construction projects in India, especially in Tamil Nadu are exposed to time and cost overrun or both. Time cost schedule is a crucial task in construction project management. This phenomenon may affect the progress of construction industry in India as well as may expose many institutions of construction to be destroyed. For instance; it can materially help to identify the expected financial requirements. It is also an important tool for the time control process. Construction project time schedule is greatly affected by many uncertain but predictable factors. This research lists the main factors affecting time and cost overrun and discusses their influence on schedule performance. The main factors are analysis using Statistical Package for the Social Science. From the analysis planning and scheduling deficiencies, financial unavailability, quality of materials, rain / inclement weather effect, inaccurate time estimates, design changes by owner found to be most critical factors.","PeriodicalId":315694,"journal":{"name":"The International Conference on scientific innovations in Science, Technology, and Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The International Conference on scientific innovations in Science, Technology, and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59544/kzon5523/ngcesi23p132","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction industry is considered as one of the most important and second largest industries in India after agriculture. It is well known that most construction projects in India, especially in Tamil Nadu are exposed to time and cost overrun or both. Time cost schedule is a crucial task in construction project management. This phenomenon may affect the progress of construction industry in India as well as may expose many institutions of construction to be destroyed. For instance; it can materially help to identify the expected financial requirements. It is also an important tool for the time control process. Construction project time schedule is greatly affected by many uncertain but predictable factors. This research lists the main factors affecting time and cost overrun and discusses their influence on schedule performance. The main factors are analysis using Statistical Package for the Social Science. From the analysis planning and scheduling deficiencies, financial unavailability, quality of materials, rain / inclement weather effect, inaccurate time estimates, design changes by owner found to be most critical factors.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
影响建设项目绩效的因素研究
建筑业被认为是印度仅次于农业的最重要和第二大产业之一。众所周知,印度的大多数建设项目,特别是在泰米尔纳德邦,都面临着时间和成本超支或两者兼而有之的问题。时间成本计划是建设项目管理中的一项重要工作。这种现象可能会影响印度建筑业的进步,也可能会使许多建筑机构遭到破坏。例如;它可以在很大程度上帮助确定预期的财务需求。它也是时间控制过程的重要工具。建设项目进度受到许多不确定但可预测因素的影响。本研究列出了影响时间和成本超支的主要因素,并讨论了它们对进度绩效的影响。主要因素是使用社会科学统计软件包进行分析。从分析中发现,计划和调度缺陷、资金不足、材料质量、降雨/恶劣天气影响、时间估计不准确、业主更改设计是最关键的因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Automated Tongue Diagnosis: A Deep Autoencoder Neural Network and Clustering-Based Image Segmentation Approach A study on Organizational Culture and its Impact on Employees Behaviour with special reference to TTK Prestige Ltd, Coimbatore A Study on Effectiveness of Performance Appraisal System With Reference To Santhigiri Ashram, Trivandrum Early Stage Diabetes Prediction of Patients in Big Data Healthcare Using Sophisticated Machine Learning Approach A Study on Effectiveness of Motivational on Employee with Special Reference to Shiash Info Solutions Pvt Ltd, Chennai.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1