{"title":"Heuristic Optimization Algorithm for Task Assignment in Collaborative Project Based on CITIS","authors":"X. Zhao, Lili Jiang, Xiaoying Xi, Muzhi Li","doi":"10.1109/CAR.2009.112","DOIUrl":null,"url":null,"abstract":"In CITIS (Contractor Integrated Technical Information Service) collaborative manufacturing project, how the prime contractor reasonably chooses cooperativeenterprises and assigns tasks among them will directly effects on gaining benefit from the project. To solve this problem, in this paper, a new heuristic optimization algorithm is proposed for tasks assignment, which objectives are minimizing costs and reducing the number of enterprises selected based on theminimization of project time. Finally, the algorithm is varied through an example, and the evaluation for it is given.","PeriodicalId":320307,"journal":{"name":"2009 International Asia Conference on Informatics in Control, Automation and Robotics","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Asia Conference on Informatics in Control, Automation and Robotics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CAR.2009.112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In CITIS (Contractor Integrated Technical Information Service) collaborative manufacturing project, how the prime contractor reasonably chooses cooperativeenterprises and assigns tasks among them will directly effects on gaining benefit from the project. To solve this problem, in this paper, a new heuristic optimization algorithm is proposed for tasks assignment, which objectives are minimizing costs and reducing the number of enterprises selected based on theminimization of project time. Finally, the algorithm is varied through an example, and the evaluation for it is given.