AVALIAÇÃO PÓS-CONSTRUÇÃO DE OBRAS PÚBLICAS: CONTRATAÇÃO EM ETAPAS DE EXECUÇÃO

Vander Yamauchi, Marcos Martinez Silvoso, Ricardo Socas Wiese
{"title":"AVALIAÇÃO PÓS-CONSTRUÇÃO DE OBRAS PÚBLICAS: CONTRATAÇÃO EM ETAPAS DE EXECUÇÃO","authors":"Vander Yamauchi, Marcos Martinez Silvoso, Ricardo Socas Wiese","doi":"10.53706/gep.v.21.6139","DOIUrl":null,"url":null,"abstract":"In Brazil, every public institution has autonomy, in compliance with current legislation, to decide the delivery method, according to its experience and team capacity, This paper proposes to evaluate multi prime contracting construction procurement based on a post-construction performance analysis for a Brazilian public university. The results suggest that buildings constructed in one stage have lower productivity and unit cost, when compared to two stage procurement. However, it was noted that the relevance of post-construction evaluation is on improving institution management processes, rather than a construction judgment instrument.","PeriodicalId":288834,"journal":{"name":"Gestão & Planejamento","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gestão & Planejamento","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53706/gep.v.21.6139","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In Brazil, every public institution has autonomy, in compliance with current legislation, to decide the delivery method, according to its experience and team capacity, This paper proposes to evaluate multi prime contracting construction procurement based on a post-construction performance analysis for a Brazilian public university. The results suggest that buildings constructed in one stage have lower productivity and unit cost, when compared to two stage procurement. However, it was noted that the relevance of post-construction evaluation is on improving institution management processes, rather than a construction judgment instrument.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
公共工程施工后评估:执行阶段的承包
在巴西,每个公共机构都有自主权,根据现行法律,根据自己的经验和团队能力来决定交付方式。本文提出了基于巴西公立大学的多主承包建筑采购的施工后绩效分析。结果表明,与两阶段采购相比,一阶段建造的建筑物具有较低的生产率和单位成本。但是,有人指出,建设后评价的意义在于改善机构管理程序,而不是作为建设判断工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COMPREENDENDO A INOVAÇÃO ABERTA A PARTIR DOS ESTUDOS BASEADOS EM PRÁTICA STAKEHOLDERS' MANAGEMENT CAPACITY IN BRAZILIAN NONPROFIT ORGANIZATIONS ANÁLISE DA ADESÃO DA RESPONSABILIDADE SOCIAL CORPORATIVA (RSC) EM EMPRESAS DO NOROESTE GAÚCHO OBSOLESCÊNCIA PROGRAMADA E PERCEBIDA: UM LEVANTAMENTO SOBRE A PERCEPÇÃO DO CICLO DE VIDA COM USUÁRIOS DE APARELHOS CELULARES MÍDIA E MANAGEMENT: A (DES)CONSTRUÇÃO SOCIAL DA IMAGEM DE EIKE BATISTA ENQUANTO EXECUTIVO DE SUCESSO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1