A. Bart, M. Benahmed, R. Cherkaoui, G. Pitteloud, A. Germond
{"title":"Long-term energy management optimization according to different types of transactions","authors":"A. Bart, M. Benahmed, R. Cherkaoui, G. Pitteloud, A. Germond","doi":"10.1109/PICA.1997.599392","DOIUrl":null,"url":null,"abstract":"In this paper, the authors describe a method for energy management, according to minimal costs criteria over one year (month after month), of an electric utility, which has to deal with nuclear and hydroelectric power plants, sale/purchase and exchange contracts, and spot market business. The chosen method for minimizing the costs is linear programming with most variables being continuous, and a few binary ones. The results obtained allow the management of every power plant, contract and the spot market business, in order to respect the economic, physical and environmental constraints.","PeriodicalId":383749,"journal":{"name":"Proceedings of the 20th International Conference on Power Industry Computer Applications","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 20th International Conference on Power Industry Computer Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1997.599392","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12
Abstract
In this paper, the authors describe a method for energy management, according to minimal costs criteria over one year (month after month), of an electric utility, which has to deal with nuclear and hydroelectric power plants, sale/purchase and exchange contracts, and spot market business. The chosen method for minimizing the costs is linear programming with most variables being continuous, and a few binary ones. The results obtained allow the management of every power plant, contract and the spot market business, in order to respect the economic, physical and environmental constraints.