Understanding IV&IV in a safety critical and complex evolutionary environment: the nasa space shuttle program

M. Zelkowitz, I. Rus
{"title":"Understanding IV&IV in a safety critical and complex evolutionary environment: the nasa space shuttle program","authors":"M. Zelkowitz, I. Rus","doi":"10.1109/ICSE.2001.919108","DOIUrl":null,"url":null,"abstract":"The National Aeronautics and Space Administration is an internationally recognized leader in space science and exploration. NASA recognizes the inherent risk associated with space exploration; however, NASA makes every reasonable effort to minimize that risk. To that end for the Space Shuttle program NASA instituted a software independent verification and validation (IV&V) process in 1988 to ensure that the Shuttle and its crew are not exposed to any unnecessary risks. Using data provided by both the Shuttle software developer and the IV&V contractor, in this paper we describe the overall IV&V process as used on the Space Shuttle program and provide an analysis of the use of metrics to document and control this process. Our findings reaffirm the value of IV&V and show the impact IV&V has on multiple releases of a large complex software system.","PeriodicalId":374824,"journal":{"name":"Proceedings of the 23rd International Conference on Software Engineering. ICSE 2001","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"19","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 23rd International Conference on Software Engineering. ICSE 2001","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSE.2001.919108","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 19

Abstract

The National Aeronautics and Space Administration is an internationally recognized leader in space science and exploration. NASA recognizes the inherent risk associated with space exploration; however, NASA makes every reasonable effort to minimize that risk. To that end for the Space Shuttle program NASA instituted a software independent verification and validation (IV&V) process in 1988 to ensure that the Shuttle and its crew are not exposed to any unnecessary risks. Using data provided by both the Shuttle software developer and the IV&V contractor, in this paper we describe the overall IV&V process as used on the Space Shuttle program and provide an analysis of the use of metrics to document and control this process. Our findings reaffirm the value of IV&V and show the impact IV&V has on multiple releases of a large complex software system.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在安全关键和复杂的进化环境中理解IV&IV:美国宇航局航天飞机计划
美国国家航空航天局是国际公认的空间科学和探索领域的领导者。美国国家航空航天局认识到与空间探索有关的固有风险;然而,NASA尽了一切合理的努力将这种风险降到最低。为了航天飞机计划的目的,NASA在1988年建立了一个软件独立的验证和确认(IV&V)过程,以确保航天飞机及其机组人员不会暴露在任何不必要的风险中。利用航天飞机软件开发商和IV&V承包商提供的数据,在本文中,我们描述了航天飞机项目中使用的整体IV&V过程,并提供了使用度量来记录和控制这一过程的分析。我们的发现重申了IV&V的价值,并展示了IV&V对大型复杂软件系统的多个版本的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Maintenance support tools for Java programs: CCFinder and JAAT (W18) 1st workshop on open source software engineering Consistent group membership in ad hoc networks A scalable formal method for design and automatic checking of user interfaces An empirical study of global software development: distance and speed
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1