Simulation Study of a GPC Controller for a Hydroelectric Plant during Electric Faults

Marcos Sacasqui, J. Luyo
{"title":"Simulation Study of a GPC Controller for a Hydroelectric Plant during Electric Faults","authors":"Marcos Sacasqui, J. Luyo","doi":"10.1109/TDC-LA.2018.8511654","DOIUrl":null,"url":null,"abstract":"This paper presents the simulation study where the classic speed controller of a hydraulic power unit has been replaced with an unrestricted generalized predictive controller. The model of the power plant includes an excitation system, subsystem (speed controller, servo motor and turbine), load 1, load 2, Three-phase Transformer, External Grid and Fault. The electric three-phase fault has 0.1 seconds of duration. The results are compared with the responses of a conventional proportional integrative and derivative controller. The library of simulation developed by MathWorks “Power-Turbine”(Simulink) and for Matlab is used, also this research includes the steps for modify the library and so adapt it for our purposes.","PeriodicalId":267301,"journal":{"name":"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2018.8511654","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper presents the simulation study where the classic speed controller of a hydraulic power unit has been replaced with an unrestricted generalized predictive controller. The model of the power plant includes an excitation system, subsystem (speed controller, servo motor and turbine), load 1, load 2, Three-phase Transformer, External Grid and Fault. The electric three-phase fault has 0.1 seconds of duration. The results are compared with the responses of a conventional proportional integrative and derivative controller. The library of simulation developed by MathWorks “Power-Turbine”(Simulink) and for Matlab is used, also this research includes the steps for modify the library and so adapt it for our purposes.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
水电站电气故障时GPC控制器的仿真研究
本文提出了用不受限制的广义预测控制器取代液压动力单元经典速度控制器的仿真研究。电厂的模型包括励磁系统、子系统(速度控制器、伺服电机和汽轮机)、负载1、负载2、三相变压器、外部电网和故障。电三相故障持续时间为0.1秒。结果与传统的比例积分微分控制器的响应进行了比较。使用了由MathWorks“Power-Turbine”(Simulink)和Matlab开发的仿真库,本研究还包括修改库的步骤,以便使其适应我们的目的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Sizing of Neutral Reactors for Magnetically Controlled Shunt Reactors Connected Directly to Power Lines The Solar eclipse of August 21, 2017 in Honduras: Evidence of the impact on the power system operation Battery Energy Storage for Frequency Support in the BCS Electric Power System Optimal Distribution Systems Expansion Planning for Improving Service Restoration Planning of must-run units and optimal load shedding to maintain the security in power systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1