Power switching technology in Japan

S. Yanabu, E. Zaima
{"title":"Power switching technology in Japan","authors":"S. Yanabu, E. Zaima","doi":"10.1109/ICEPE-ST.2011.6122915","DOIUrl":null,"url":null,"abstract":"Power switching technology is mainly conducted with EMTP usually conducted in everywhere in the world, and a lot of experiment is conducted in the entire world in this stage. UHV project is studied in Japan because of the large demand of electric energy and one this kind of energy demand will occur in the densely populated area from large scale of transmission because of energy supply to the city center of populated area. We will discuss the AC transmission voltage for above 800kV and also discuss the feasibility of 500kV DC transmission. And solution of various problem will be discussed.","PeriodicalId":379448,"journal":{"name":"2011 1st International Conference on Electric Power Equipment - Switching Technology","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 1st International Conference on Electric Power Equipment - Switching Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEPE-ST.2011.6122915","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Power switching technology is mainly conducted with EMTP usually conducted in everywhere in the world, and a lot of experiment is conducted in the entire world in this stage. UHV project is studied in Japan because of the large demand of electric energy and one this kind of energy demand will occur in the densely populated area from large scale of transmission because of energy supply to the city center of populated area. We will discuss the AC transmission voltage for above 800kV and also discuss the feasibility of 500kV DC transmission. And solution of various problem will be discussed.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
日本的电源开关技术
功率交换技术主要是用EMTP进行的,通常在世界各地进行,在这个阶段全世界都进行了大量的实验。日本之所以研究特高压工程,是因为日本对电能的需求量很大,而由于向人口密集地区的城市中心供电,大规模的输电将会对人口密集地区产生这种能源需求。讨论800kV以上交流输电电压和500kV直流输电的可行性。并讨论了各种问题的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
HVDC system for a data center equipped with SiC power devices Studies of high current arcs using an optical fiber array based imaging system Experimental investigation on the gas flow motion of puffer circuit breaker Feasibility study of metalized membrane method applied to monitoring corona loss of AC/ DC transmission line Interrupter pressure measurement of a 252 kV SF6 circuit breaker
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1