Utilization of idle power plant for own use and excess power in an oil-and-gas company

Y. Ohira, Yoyok Dwi Setyo Pambudi, C. Hudaya
{"title":"Utilization of idle power plant for own use and excess power in an oil-and-gas company","authors":"Y. Ohira, Yoyok Dwi Setyo Pambudi, C. Hudaya","doi":"10.1109/QIR.2017.8168500","DOIUrl":null,"url":null,"abstract":"The Indonesian government (GoI) applies the cost recovery concept in the upstream sector of the oil and gas resources. It postulates the expenses spent by the contractor during exploration and exploitation activities will be settled through production sharing scheme. The cost includes the compensation for the production equipment and utilities, not to mention the power generator. When the oil-and-gas exploitation declines or even shut-in due to technical and economic reasons, some of them become idle assets. In this study, we investigate the utilization of the idle 2 × 750 kVA gas engine power generators for a new gas facilities project in different region. As the newly facilities require a smaller power supply (2 × 350 kVA) than the power plant capacity, the excess power is proposed to be sold to the electric utility. Here, an economic analysis is carried out to compare between purchasing new power generators and the utilization of the idle ones. The result shows that the utilization of idle asset provides economic benefit both for the GoI and the contractor. This scheme will solve the electricity need for own use and the excess power may be transferred to the electric utility, realized by power purchase agreement.","PeriodicalId":225743,"journal":{"name":"2017 15th International Conference on Quality in Research (QiR) : International Symposium on Electrical and Computer Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 15th International Conference on Quality in Research (QiR) : International Symposium on Electrical and Computer Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/QIR.2017.8168500","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Indonesian government (GoI) applies the cost recovery concept in the upstream sector of the oil and gas resources. It postulates the expenses spent by the contractor during exploration and exploitation activities will be settled through production sharing scheme. The cost includes the compensation for the production equipment and utilities, not to mention the power generator. When the oil-and-gas exploitation declines or even shut-in due to technical and economic reasons, some of them become idle assets. In this study, we investigate the utilization of the idle 2 × 750 kVA gas engine power generators for a new gas facilities project in different region. As the newly facilities require a smaller power supply (2 × 350 kVA) than the power plant capacity, the excess power is proposed to be sold to the electric utility. Here, an economic analysis is carried out to compare between purchasing new power generators and the utilization of the idle ones. The result shows that the utilization of idle asset provides economic benefit both for the GoI and the contractor. This scheme will solve the electricity need for own use and the excess power may be transferred to the electric utility, realized by power purchase agreement.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
石油天然气公司自用闲置电厂及余电量的利用
印度尼西亚政府(GoI)将成本回收概念应用于油气资源的上游部门。它假定承包商在勘探开采活动中所花费的费用将通过产量分成方案来解决。该费用包括生产设备和公用设施的补偿,更不用说发电机了。由于技术和经济原因,当油气开采减少甚至关停时,其中一些就成为闲置资产。本文以某地区新建燃气设施项目为研究对象,对其闲置2 × 750 kVA燃气发动机发电机组的利用情况进行了研究。由于新设施所需的电力(2 × 350kva)比发电厂的容量要小,因此建议将多余的电力出售给电力公司。在此,对购买新发电机组和闲置发电机组的利用进行了经济分析。结果表明,闲置资产的利用对政府和承包商都具有经济效益。本方案解决了用户自用的用电需求,多余的电量可以通过购电协议向电力公司转移。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Effect of anode and cathode workfunction on the operating voltage and luminance of a single emissive layer organic light emitting diode Concept development for quantification of integrated energy security Indonesian text feature extraction using gibbs sampling and mean variational inference latent dirichlet allocation Measurement of particles in oil using shear horizontal surface acoustic wave sensor Palm vein recognition by using modified of local binary pattern (LBP) for extraction feature
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1