What does "real-time" project control really mean?

S. Isaac
{"title":"What does \"real-time\" project control really mean?","authors":"S. Isaac","doi":"10.35490/EC3.2019.141","DOIUrl":null,"url":null,"abstract":"It is proposed that the application of real-time monitoring technologies requires an integration and mutual adjustment of planning and control processes as well, for the automation to be effective. An approach for integrating planning, monitoring and control is presented, and demonstrated in examples of schedule and safety control. Similar solutions can also be developed in other domains. The introduction of automated monitoring technologies can thus lead to future research that will revolutionize planning and control processes, and construction management in general.","PeriodicalId":126601,"journal":{"name":"Proceedings of the 2019 European Conference on Computing in Construction","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2019 European Conference on Computing in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35490/EC3.2019.141","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

It is proposed that the application of real-time monitoring technologies requires an integration and mutual adjustment of planning and control processes as well, for the automation to be effective. An approach for integrating planning, monitoring and control is presented, and demonstrated in examples of schedule and safety control. Similar solutions can also be developed in other domains. The introduction of automated monitoring technologies can thus lead to future research that will revolutionize planning and control processes, and construction management in general.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
“实时”项目控制的真正含义是什么?
提出实时监控技术的应用需要规划和控制过程的整合和相互调整,以实现有效的自动化。提出了一种综合规划、监控和控制的方法,并以进度和安全控制为例进行了论证。在其他领域也可以开发类似的解决方案。因此,自动化监控技术的引入可以导致未来的研究,这将彻底改变规划和控制过程,以及一般的施工管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An IFC data preparation workflow for building energy performance simulation BIM-based Holonic System for Real-Time Pathfinding in Building Emergency Scenario Semantic and syntactic interoperability of BIM and asset management data Digital built environment maturity model: Digital twins advancing smart infrastructure asset management Optimum topological configurations of sensor networks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1