Union Challenges to Methods Improvement Programs

H. Thomas, Mason P. Holland
{"title":"Union Challenges to Methods Improvement Programs","authors":"H. Thomas, Mason P. Holland","doi":"10.1061/JCCEAZ.0000915","DOIUrl":null,"url":null,"abstract":"This paper presents nine case studies that illustrate the type of labor relation problems that should be anticipated by management whenever a formal productivity measurement program using stopwatches, video tape, or time-lapse photography is initiated. Each case was settled via formal grievance procedures. The rulings of the arbitrators establish guidelines regarding the scope and nature of methods improvement programs, acceptable techniques for measuring productivity, use of time standards, civil liberties of the craftsman, disciplinary action, and favorable language in the collective bargaining agreement. It is shown that management has the right to unilaterally undertake time studies and to establish production standards. It is illustrated that the exact wording of the collective bargaining agreement is the key to establishing what measurement techniques are acceptable. Examples of management rights clauses are presented.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"106 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1980-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Construction Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JCCEAZ.0000915","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This paper presents nine case studies that illustrate the type of labor relation problems that should be anticipated by management whenever a formal productivity measurement program using stopwatches, video tape, or time-lapse photography is initiated. Each case was settled via formal grievance procedures. The rulings of the arbitrators establish guidelines regarding the scope and nature of methods improvement programs, acceptable techniques for measuring productivity, use of time standards, civil liberties of the craftsman, disciplinary action, and favorable language in the collective bargaining agreement. It is shown that management has the right to unilaterally undertake time studies and to establish production standards. It is illustrated that the exact wording of the collective bargaining agreement is the key to establishing what measurement techniques are acceptable. Examples of management rights clauses are presented.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
工会对方法改进计划的挑战
本文提出了9个案例研究,说明了劳资关系问题的类型,当使用秒表、录像带或延时摄影启动正式的生产力测量程序时,管理层应该预料到这些问题。每个案件都通过正式的申诉程序得到解决。仲裁人的裁决建立了关于方法改进计划的范围和性质、可接受的测量生产力的技术、时间标准的使用、工匠的公民自由、纪律行动和集体谈判协议中的有利语言的指导方针。这表明,管理层有权单方面进行时间研究和制定生产标准。说明了集体谈判协议的确切措辞是确定可接受的衡量技术的关键。给出了经营权条款的例子。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Closure of "An optimum Bid Approximation Model" Construction of Offshore Platforms Prevention and Resolution of Construction Claims The Resident Engineer: Intermediary Between Owner and Contractor Graphical Method of Optimization: A Short Cut
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1